My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
First Amendment to PSA - Design Services Related to the Douglas Road Lift Station – DLZ Indiana LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
First Amendment to PSA - Design Services Related to the Douglas Road Lift Station – DLZ Indiana LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2020 2:11:04 PM
Creation date
6/23/2020 2:11:02 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/23/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />This is EXHIBIT K, consisting of 3pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated March 26, 2019. <br /> <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. __1___ <br /> <br />1. Background Data: <br /> <br />a. Effective Date of Owner-Engineer Agreement: March 26, 2019 <br /> <br />b. Owner: City of South Bend acting by and through the Board of Public Works <br /> <br />c. Engineer: DLZ Indiana, LLC, 2211 East Jefferson Blvd. South Bend, Indiana <br />46615 <br /> <br />d. Project: DOUGLAS ROAD LIFT STATION RELOCATION <br /> <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) Add the following to the end of the Project Description of Engineers Services: <br /> <br />Prapproximately 275 <br />lineal feet of 12 water main due to conflicts with the Douglas Road <br />Reconstructions Project Des. No. 1400639 project, which includes added travel <br />lanes and bridge reconstruction from Ivy Road to S.R. 23. The 12 water main will <br />be relocated in the segment in the immediate vicinity of Juday Creek. The existing <br />water main is in conflict with the proposed bridge crossing of Juday Creek. The <br />relocation of the 12 water main will include an approximate 75-foot segment that <br />will be above grade and supported on the bridge (near the road elevation). The <br />above grade water mains will include heat trace, insulation and a hanger system to <br />suspend the watermain on the side of the bridge deck. <br /> <br />b. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />1) ADD Item A.2.e in Exhibit A Paragraph A1.02 Final Design Plans as follows: <br /> <br />e. Water Main Design <br />1) The relocation of the approximate 275 ft segment of 12 water main will <br />be incorporporated into the road reconstruction plans, of which 75 ft will <br />be above grade and supported by the bridge structure. <br /> <br />Page 1 <br />(Exhibit K (Amendment to Owner-Engineer Agreement) Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.