My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
•Integrated stabilizer design results in greater stability. <br />-Low spring rate air springs for excellent quality. <br />Dual height control valves to maintain level from side to side. <br />OIL SEALS <br />Oil seals shall be provided on the rear axle. <br />REAR TIRES <br />YE O <br />Rear tires shall be four (4) Michelin XDS 12R22.516 ply rated for 27,120 lb maximum axle <br />load and 75 mph maximum speed. <br />The tires shall be mounted on Alcoa 22.50" x 8.25" polished aluminum disc wheels with a <br />ten (10)-stud 11.25" bolt circle. <br />ES O <br />TIRE BALANCE <br />All tires shall be balanced. <br />TIRE PRESSURE MANAGEMENT <br />(9NO <br />There shall be a tire alert pressure management system provided that shall monitor each tire's <br />pressure. A sensor shall be provided on the valve stem of each tire for a total of six (6) tires. <br />HUB COVERS (front) <br />(YE NO <br />Stainless steel hub covers shall be provided on the front axle. An oil level viewing window <br />shall be provided. <br />HUB COVERS (rear) <br />YES O <br />A pair of stainless -steel high -hat hub covers shall be provided on rear axle hubs. <br />MUD FLAPS <br />(QSNO <br />Mud flaps shall be installed behind the front and rear wheels of the apparatus. <br />ANTI -LOCK BRAKE SYSTEM <br />0qO <br />The vehicle shall be equipped with a Wabco 4S4M, anti-lockbraking system. TheABS shall <br />provide a four (4) channel anti -lock braking control on both the front and rear wheels. A <br />digitally controlled system that utilizes microprocessor technology shall control the anti -lock <br />braking system. Each wheel shall be monitored by the system. When any particular wheel <br />begins to lockup, a signal shall be sent to the control unit. This control unit then shall reduce <br />the braking of that wheel for a fraction of a second and then reapply the brake. This anti -lock <br />brake system shall eliminate the lockup of any wheel thus helping to prevent the apparatus <br />from skidding out of control. <br />ANTI -LOCK BRAKE SYSTEM WARRANTY <br />ES*o <br />The Wabco ABS system shall come with a three (3) year or 300,000-mile parts and labor <br />warranty provided by Meritor Wabco Vehicle Control Systems. <br />BRAKES <br />ES O <br />The service brake system shall be full air type. <br />The front brakes shall be Knorr/Bendix disc type with a 17.00" ventilated rotor forimproved <br />stopping distance. <br />The brake system shall be certified, third party inspected, for improved stopping distance. <br />The rear brakes shall be disc brakes with automatic slack adjusters. <br />AIR COMPRESSOR, BRAKE SYSTEM <br />r DES No <br />._._--- -_-- <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.