Laserfiche WebLink
equipment delivered. <br />INFORMATION REQUIRED <br />The manufacturer shall supply at time of delivery, complete operation and maintenance YE /NO <br />manuals covering the completed apparatus as delivered A permanent plate shall be mounted <br />in the driver's compartment which specifies the quantity and type of fluids required including <br />engine oil, engine coolant, transmission, pump transmission lubrication, pump primer and <br />drive axle. <br />PERFORMANCE TESTS AND REQUIREMENTS <br />A road test shall be conducted with the apparatus fully loaded and a continuous run of ten @No <br />(10) miles or more shall be made under all driving conditions, during which time the <br />apparatus shall showno loss of power or overheating. The transmission drive shaft or shafts, <br />and rear axles shall run quietly and be free from abnormal vibration or noise throughout the <br />operating range of the apparatus. Vehicle shall adhere to the following parameters: <br />A) The apparatus, when fully equipped and loaded, shall have not less than 25 percent nor <br />more than 50 percent of the weight on the front axle, and not less than 50 percent nor more <br />than 75 percent on the rear axle. <br />B) The apparatus shall be capable of accelerating to 35 mph from a standing start within 20 <br />seconds on a level concrete highway without exceeding the maximum governed rpm of the <br />engine. <br />C) The service brakes shall be capable of stopping a fully loaded vehicle in 35 feet at 20 mph <br />on a level concrete highway. The air brake system shall conform to Federal Motor Vehicle <br />Safety Standards (FMVSS)121. <br />D) The apparatus, fully loaded, shall be capable of obtaining a speed of 50 mph on a level <br />concrete highway with the engine not exceeding its governed rpm (full load). <br />FAILURE TO MEET TEST rvv z .Tn <br />In the event the apparatus fails to meet the test requirements of these specifications on the <br />first trial, second trials may be made at the option of the bidder within 30 days of the date of <br />the first trial. Such trials shall be final and conclusive and failure to comply with these <br />requirements shall be cause for rejection. Failure to comply with changes to conform to any <br />clause of the specifications, within 30 days after notice is given to the bidder of such <br />changes, shall also be cause for rejection of the apparatus. Permission to keep or store the <br />apparatus in any building owned oroccupied by the purchaser or its use by the purchaser <br />during the above -specified period with the permission of the bidder shall not constitute <br />acceptance. <br />LIABILITY ES O <br />The successful bidder shall defend any and all suits and assume all liability for the use of an <br />patented process including any device or article forming a part of the apparatus or any <br />appliance furnished under the contract. <br />EXCEPTIONS <br />YES O <br />All exceptions shall be stated no matterhow seemingly minor. Any exceptions not taken <br />shall be assumed by the purchaser to be included in the proposal, regardless of the cost to the <br />bidder. <br />GENERAL CONSTRUCTION I <br />YES O <br />The apparatus shall be designedwith due consideration to distribution of load between the <br />front and rear axles. Weieht balance and distribution shall be in accordance with the <br />ff <br />