My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
bid selection process. FOB Central Services. The unit and all related paperwork is to be <br />delivered to: <br />Central Services Division <br />1045 West Sample Street <br />South Bend, Indiana 46619 <br />All Certificates of Origin/Title Work shall list the owner as: <br />The City of South Bend <br />1045 West Sample Street <br />South Bend, Indiana 46619 <br />The Board will award the bid to the lowest responsible and responsive bidder. If the bid is not <br />awarded to the lowest bidder, the factors used to justify the awards will be stated in writing at the <br />request of any bidder. <br />The Board reserves the right to reject any and/or all bids or portions thereof and to waive any <br />irregularities or informalities. <br />QUALITY AND WORKMANSHIP <br />The design of the apparatus shall embody the latest approved automotive engineering <br />practices. The workmanship shall be of the highest quality in its respective field. Special <br />consideration shall be given to the following points: Accessibility of the various units which <br />require periodic maintenance; ease of operation (including both pumping and driving); and <br />symmetrical proportions. Construction shall be rugged and ample safety factors shall be <br />provided to carry the loads specified and to meet both on and off -road requirements and <br />speed conditions as set forth under Performance Tests and Requirements. Welding shall not <br />be employed in the assembly of the apparatus in a manner that shall prevent the ready <br />removal of any component part for service or repair. All steel welding shall follow Americar <br />Welding Society D 1.1-2004 recommendations for structural steel welding. All aluminum <br />welding shall follow American Welding Society and ANSI D 1.2-2003 requirements for <br />structural welding of aluminum. All sheet metal welding shall follow American Welding <br />Society 132.1-2000 requirements for structural welding of sheet metal. Flux core arc welding <br />to use alloy rods, type 7000, American Welding Society standards A5.20-E70T1. Employee,, <br />classified as welders are tested and certified to meet American Welding Society codes upon <br />hire and every three (3) years thereafter. The manufacturer shall be required to have an <br />American Welding Society certified welding inspector in plant during working hours to <br />monitor weld quality. <br />DELIVERY YE O <br />kpparatus, to ensure proper break in of all components while still under warranty, shall be <br />lelivered under its own power - rail or truck freight shall not be acceptable. A qualified <br />lelivery engineer representing the contractor shall deliver the apparatus and remain for a <br />ufficient length of time to instruct personnel in the proper operation, care and maintenance o <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.