My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Seitz Park Reconstruction Phase I Proj No. 117-093A - Northern Indiana Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:20:24 PM
Creation date
6/9/2020 3:58:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The module will transmit a password protected web page to a WiFi enabled device (i.e. most smart <br />phones, tablets or laptops) allowing two levels of user interaction. The firefighter level will allow vehicle <br />monitoring of the vehicle and firefighting systems on the apparatus. The technician level will allow <br />diagnostic access to inputs and outputs installed on the Command Zone, control and information <br />system. <br />The data logging capability will record faults from the engine, transmission, ABS and Command Zone, <br />control and information systems as they occur. No other data will be recorded at the time the fault <br />occurs. The data logger will provide up to 2 Gigabytes of data storage. <br />A USB connection will be provided on the Tech Module. It will provide a means to download data <br />logger information and update software in the device. <br />Indicator Licaht and Alarm Prove -Out System <br />A system will be provided which automatically tests basic indicator lights and alarms located on the cab <br />instrument panel. <br />Voltane Monitor System <br />A voltage monitoring system will be provided to indicate the status of the battery system connected to <br />the vehicle's electrical load. The system will provide visual and audible warning when the system <br />voltage is below or above optimum levels. <br />The alarm will activate if the system falls below 11.8 volts DC for more than two (2) minutes. <br />Power and Ground Studs <br />Spare circuits will be provided in the primary distribution center for two-way radio equipment. <br />The spare circuits will consist of the following: <br />• One (1) 12-volt DC, 30 amp battery direct spare <br />• One (1) 12-volt DC ground and un-fused switched battery stud located in or adjacent to the <br />power distribution center <br />Enhanced Software <br />The solid-state control system will include the following software enhancements: <br />All perimeter lights and scene lights (where applicable) will be deactivated when the parking brake is <br />released. <br />Cab and crew cab dome lights will remain on for 10 seconds for improved visibility after the doors <br />close. The dome lights will dim after 10 seconds or immediately if the vehicle is put into gear. <br />Cab and crew cab perimeter lights will remain on for 10 seconds for improved visibility after the doors <br />close. The dome lights will dim after 10 seconds or immediately if the vehicle is put into gear. <br />EMI/RFI Protection <br />To prevent erroneous signals from crosstalk contamination and interference, the electrical system will <br />meet, at a minimum, SAE J551/2, thus reducing undesired electromagnetic and radio frequency <br />46 of 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.