Laserfiche WebLink
and oil seals. No special or sleeve type bearings shall be used. <br />Pump shall be equipped with a self-adjusting, maintenance -free, mechanical shaft seal. <br />The mechanical seal shall consist of a flat, highly polished, spring fed carbon ring that rotate: <br />with the impeller shaft. The carbon ring shall press against a highly polished stainless -steel <br />stationary ring that is sealed within the pump body. <br />In addition, a throttling ring shall be pressed into the steel chamber cover, providing a very <br />small clearance around the rotating shaft in the event of a mechanical seal failure. The pump <br />performance shall not deteriorate, nor shall the pump lose prime, while drafting if the seal <br />fails during pump operation. <br />Wear rings shall be bronze and easily replaceable to restore original pump efficiency and <br />eliminate the need to replace the entire pump casing due to wear. <br />PUMP TRANSMISSION <br />Pump transmission shall be made of a three (3) piece, aluminum, horizontally split casing. <br />Power transfer to pump shall be through a high strength Morse HY-VO silent drive chain. <br />Drive shafts shall be a minimum of 2.35" diameter hardened and ground alloy steel. All <br />shafts shall be ball bearing supported. The case shall be designed as to eliminate the need for <br />water cooling. <br />kIR PUMP SHIFT <br />Pump shift engagement shall be made by a two (2) position sliding collar, actuated <br />pneumatically (by air pressure), with a three (3) position air control switch located in the cab. <br />Two (2) indicator lights shall be provided adjacent to the pump shift inside the cab. One (1) 9NO <br />green light shall indicate the pump shift has been completed and be labeled "pump engaged" <br />The second green light shall indicate when the pump has been engaged, and that the chassis <br />transmission is in pump gear. This indicator light shall be labeled "OK to pump". <br />Another green indicator light shall be installed adjacent to the hand throttle on the pump <br />panel and indicate either the pump is engaged, and the road transmission is in pump gear, or <br />the road transmission is in neutral and the pump is not engaged. This indicator light shall be YES O <br />labeled "Warning: Do not open throttle unless light is on". <br />Che pump shift control in the cab shall be illuminated to meet NFPA requirements. Also <br />:onsistent with the requirements in NFPA 1901, To help prevent the accidental increase of th <br />hrottle while still in the ROAD position there shall be three different safety interlocks before <br />he pump panel throttle can be increased The three safety interlocks are confirmation of the <br />apparatus parking brake activated, confirmation of a completed pump shift and confirmation <br />)f 4th gear lockup pump mode of the apparatus transmission. <br />CRANSMISSION LOCK -UP <br />The direct gear transmission lock -up for the fire pump operation shall engage automatically YE O <br />when the pump shift control, in the cab, is activated. <br />kUXILIARY COOLING SYSTEM <br />A supplementary heat exchange cooling system shall be provided to allow the use of water <br />from the discharge side of the pump for cooling the engine water. Heat exchanger shall be <br />cylindrical type and shall be a separate unit. It shall be installed in the pump or engine <br />compartment with the control located on the pump operator's control panel. Exchanger shall <br />be plumbed to the master drain valve. <br />NTAKE RELIEF VALVE <br />57 <br />