My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
October 2018
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2018
>
October 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 6:47:29 PM
Creation date
6/8/2020 10:19:11 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001404
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mitigation and Construction Plan <br />The temporary supports that we have previously placed are on weak surfaces. Collapse is a great risk <br />as is, but very likely to occur with the weight of snow. The time of year and expected time frame of the <br />project precludes this being completed before winter, so work shall be done in 2 phases: <br />1. demolition and safety securing of the site — as soon as approved and permitted <br />2. rebuild — in Spring 2019 <br />The detail of the demolition is outlined in Jeff Weldy's proposal included separately here. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.