Laserfiche WebLink
Decking • <br />Install treated deck boards perpendicular to joists. Deck boards attached to <br />joists with deck screws, drilled through the deck board surface. No band <br />boards. No painting or staining. <br />Miscellaneous <br />Construction may begin in June or July and will take approximately 1-2 <br />weeks to complete. Deck is proposed with no hand rail, with the deck <br />surface to be at approx. 12" above the dirt of your yard. <br />Proposal is contingent on approval from Historic Preservation Commission. <br />Our opinion is that your existing pergola structure is unsafe and should be <br />removed before someone becomes injured. It is not original to the house <br />and not in keeping with the age of the home. <br />Project Price: <br />$ 5,371.00 <br />Homeowner Initial <br />Designer Initial <br />Option #1: Composite Decking • <br />Instead of the treating decking surface proposed, we will supply and install <br />new Fiberon Horizon Decking, Color TBD from standard offering. The <br />composite deck will feature a hidden fastener and a perimeter band board to <br />conceal the cut edges of the deck. <br />Option Price: ADD $ 2,705.00 <br />Homeowner Initial <br />Designer Initial <br />Total Project Price w/ selected options $ <br />Homeowner Initial <br />Designer Initial <br />Total Down payment (Total x 30%) $ <br />Homeowner Initial <br />Designer Initial <br />• <br />Initial <br />Date <br />