My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
May 2018
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2018
>
May 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 6:39:53 PM
Creation date
6/8/2020 10:19:03 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001404
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• 5. Project Satisfaction <br />We aren't finished until you are satisfied. Prior to completion you will be <br />asked to fill out a "punch list" with any items in the project that need <br />attention. Completion of this punch list will give your agreement that the <br />project is complete. We provide a 2 -year warranty on workmanship and <br />materials used to build your project. <br />Upon completion of your project, you will receive a survey, via email, from <br />Guild Quality. The values we strive to demonstrate in our work with you <br />are: communication, construction quality, organized and professional, <br />integrity, reliability, care and teamwork. We rely on the Guild Quality <br />Survey to get your valuable feedback on how we demonstrated these values. <br />Completing this survey helps us measure of how we did. It's our basis for <br />rewarding employees, addressing development opportunities and measuring <br />our success. It's our "report card" and your input is critical to us. <br />Description of Project <br />We will remove an unsafe and deteriorating deck/ pergola type structure on <br />• the side of your home exiting the kitchen area. We will build a new 16' x <br />16' deck of treated wood material, one step down from your home's floor <br />level to put the deck closer to the ground, to avoid the requirement of a new <br />handrailing. <br />• <br />Removals <br />Remove deck to include decking, pergola posts, open roof structure, and the <br />metal frame work supporting the deck boards. <br />Excavation/ Foundation <br />Dig for 6 post holes approx. 3' deep, pour concrete in bottom. <br />Framing <br />Install 6" x 6" (6) in the new post holes. Build two beams from treated 2" x <br />10". Install ledger board at house, set new treated 2" x 10" joists <br />perpendicular to beams every 16" on center. Joist hangers where joists <br />attach to ledger board. <br />Initial <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.