Laserfiche WebLink
• <br />Page 2 of 3 <br />Complete tear off and re -roof using the Johns Manville (JM) .060m1 TPO Rhino Bond system. <br />Between the drain locations, mechanically attach the JM Tapered Panels to promote proper <br />drainage to the drain sumps. <br />Membranes and Flashings. <br />• Over the insulation assembly, install the JM .060ml TPO field membrane, welding to the Rhino <br />plates using the JM induction welder. <br />• At all parapet walls, skylight, and unit curbs, fully adhere the JM .060m1 flashing membranes per <br />manufacturers' specifications extending up and over the coping stone and the new wood <br />blocking. <br />• At all thru roof VTR's (vent to roof bathroom pipes), install the JM premanufactured pipe <br />flashing details. <br />Sheet Metal Flashings and Trim <br />• Custom fabricate and install the JM Presto Tite edge metal detail at all parapet walls using .24ga <br />Kynar coated metal. Color is optional to the owner from their standard color selections. <br />Existing Skylights <br />• Provide and install temporary heavy duty tarping to cover the skylights to insure a watertight <br />condition for the roof assembly. Note: There is no warranty associated with the length of time • <br />they will remain in a watertight condition. <br />'Vendeff Simmons <br />Project Manager <br />Slatile Roofing and Sheet Metal Co., INC <br />Phone: 574-233-7485 Fax: 574-233-7531 <br />Cell: 574-4.40-5925 <br />Email: wendells@ latileroofina.com <br />0 <br />