Laserfiche WebLink
SECOND FLOOR: <br />Back Side/Rear Bedroom: <br />.7 <br />The current rear room of the second floor has low ceilings and no windows. In addition the <br />doorway is too low. The changes in this room involve rebuilding the roof in order to insert <br />two shed dormers with windows. These windows will be double hung but of small <br />dimensions to fit in the dormer. A round porthole window will be inserted just under the <br />peak of the roof on the back of the house in this rear bedroom. <br />EXTERIOR GARDEN IMPROVEMENTS: <br />The addition to the front house (908 Leland) will shrink the space between it and the <br />cottage behind (906 Leland). This small and dark space will be graded and paved in water <br />permeable ceramic brick of an organic color to form a patio space for the properties to <br />share. (For seasonal color, large-ish planters with shade friendly plants will be installed.) <br />The same brick will be used to pave the parking pad behind the front house and <br />immediately adjacent to the north side of the cottage. <br />The space between 906/908 Leland and 902 Leland to the south will be landscaped as will <br />the front of the property at 908. New sidewalk will be installed in 2018 as the current one <br />is extremely broken up. <br />A new large tree will be planted hopefully adjacent to the back addition of 908 in order to <br />replace the maple that had to be cut down to fix the broken sewer and allow for the <br />addition. <br />• <br />3 <br />