My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
August 2017
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2017
>
August 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:21 PM
Creation date
6/8/2020 10:17:49 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001364
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Feasibility Study <br />Marquette Primary Center --Option 132 <br />Renovation 1 Addition to existing Facility - 500 Student Capacity <br />Four Section K - 4 <br />In Option B2 total 91,500 SF and overlays present day Educational <br />Space Guidelines used in the layouts of Options A2 -- A4 onto the <br />existing building. Through additions and rearrangement of existing <br />uses, this plan brings the 1936, 1948 and 1953 structures up to <br />present day standards. The additions are located where this work <br />can occur during occupancy. <br />Key areas of the existing school that are undersized: <br />1. Administration and Student services <br />2. Food Service <br />3. Media center/ Library <br />4. Gymnasium <br />By adding a new gym and kitchen area to the North of the existing <br />stage, we opened up existing areas to be reconfigured and improve <br />circulation at the same time. By converting three undersized <br />classroom into two we can achieve similar classroom sizes to the now <br />solutions, however due to layout this is not feasible in all areas and <br />some classrooms will remain smaller than those that are <br />reconfigured. <br />HEBARD & HEBARD Architects, Inc. <br />South Bend Community School <br />Corporation <br />Hiuhli0ts: <br />Curriculum: <br />Traditional <br />Capacity: <br />500 K - 4 <br />Area: <br />91, 500 St; <br />Hard Cost: <br />$14,024,322 <br />Total Project: <br />$17,810,888* <br />'Hard & Sort Costs <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.