Laserfiche WebLink
South Bend Community School <br />Corporation <br />f=easibility StudY__....._.___....... . <br />Marquette Primary Center <br />1, Facility Options <br />The basis for each planning option were developed through <br />discussions with SBCSC administration. The student capacity, grade <br />configuration and programmatic needs were reviewed and fine tuned <br />in an effort to provide the Board of Trustees the most logical options <br />to evaluate. Renovation and Additions in comparison to New <br />Construction use the same educational program and student <br />capacities to provide and effective comparison. <br />In our experience, overlaying present day Educational Space <br />Guidelines and finding appropriate locations to add onto existing <br />structures often create larger facilities than would result if building <br />new. These inefficiencies and larger areas often offset the savings <br />one would expect to find in a renovation. <br />The only way to evaluate which direction to proceed is to develop <br />concept plans of both New and Renovation using the same criteria. <br />The Programmatic Space Summary will change slightly through the <br />Design Phases with Staff, Administration and Community input, <br />however based upon our experience the presented scopes should be <br />very close to the final solutions. <br />As part of this study we were asked to add the `what if° Marquette <br />were to use a Montessori curriculum and how would this affect the <br />plan and resulting cost. At this time the funding to support the cost <br />and transportation for a Magnet Program are not resolved. We have <br />provided several options for your consideration in evaluating this <br />subject. <br />Please find the followina Plannina Ootions: <br />11. Option 132 -- Renovation 1 Addition to existing Facility 500 Student <br />Capacity <br />2. Option A2 — New 500 Student Capacity Traditional Curriculum <br />3. Option A3 — New 500 Student Capacity Montessori Academy <br />4. Option Ad — New 500 Student Capacity Expandable Montessori <br />Academy <br />These are followed by the Construction Cost Projections at the end of <br />this TAB 2 <br />HEBARD & HEBARD Architects, Inc.VW <br />rf <br />page 12 <br />