Laserfiche WebLink
MARQUETTE PRIMARY CENTER <br />SOUTH BEND COMMUNITY SCHOOL. CORPORATION <br />FEASIBILITY STUDY <br />PROGRAM SQUARE FOOTAGE SUMMARY <br />K-41 OPTION °A4" NEW SCHOOL BUILDING - TRADITIONAL <br />PHASED TO MONTESSORI CURRICULUM <br />April 23, 20D7 <br />PHASE (1) ONE SUMMARY OF SQUARE FOOTAGE BY AREA <br />lAdministrative Serivices <br />2,200 <br />Student Services <br />2,500 <br />Media Services <br />•-----• <br />6,000 <br />Art <br />2,000 _...._�... <br />Music/ Stage <br />1,80_0__ — <br />Traditional Academic Grade Structure <br />22,320 ^ ~ <br />Shared Lab/Instruction Areas _ <br />2,370 <br />Special Needs <br />3,830 <br />Physical Education <br />5,720 <br />Food Services -_ <br />6,000 <br />Faculty Spaces <br />1,300 <br />TOTAL PROGRAM SQUARE FOOTAGE: <br />56,040 <br />Toilets - Mechanical/Electrical Systems - 34,_660 <br />CirculationlStorage - Walls Q 3 8% Factor. _Y <br />Mechanical/Electrical Systems Mezzanine (3,000) <br />(N.I.0 - Gross Area) <br />Main Floor 55,400 <br />Upper Floor 35,300 <br />Total Building Gross SF Phase 1 90,700 <br />PHASE (2) TWO SUMMARY OF SQUARE FOOTAGE BY AREA <br />Montessori Academic Grade Structure 21,000 <br />Toilets - Mechanica!/Electricai Systems -1 10,400 <br />Circulation/Storage - Walls @ 33% Factor. <br />Main Flood 16,100 <br />_ Upper Floor 15,300 <br />Total Building Gross SF Phase 2 31,400 <br />Combined Building Gross SF <br />Phase 1 90,700 <br />Phase 2� .-.-•..., 31,400 <br />Total <br />.. <br />_ __ Total Building Gross SFj __-_ 122,400 <br />