My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
August 2016
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2016
>
August 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:20 PM
Creation date
6/8/2020 10:17:14 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001364
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />S e i-� ty Kole r'S4.a h / s`` f �� 4'io. <br />Mark Kolodziejczyk <br />55475 Beech Rd. <br />Osceola, IN 46561 <br />(574) 520 -2974 <br />PROPOSAL <br />07-28-2016 <br />Ms. Sarah Cullinan <br />1313 E. Wayne St. S <br />South Bend, IN 46615 <br />(574) 234 -3675 <br />Sin7p1j Kole Remodeling proposes to transform a screened in porch into a four season <br />room at the home located at 1313 E. Wayne St. S. in South Bend, IN. <br />Floor: <br />The existing concrete will be prepped and 6X24 ceramic tile will be installed. <br />Ceramic tile will be grouted and receive one coat of grout sealer. <br />Ceilinz. <br />The existing beat board will be removed and R -30 insulation will be installed. A <br />new beat board will be installed on the ceiling. <br />Walls: <br />Existing window will be taken out and a new wooden interior French door with <br />glass will be installed in the place of the window. All screens will be removed and 2X4 walls <br />will be framed with a treated bottom plate. %2 inch OSB sheeting will be nailed on the outside <br />and covered with house wrap vapor barrier.) The pillar will be partially exposed; each section <br />between pillars will be framed in for three (3) windows Winches tall. The wall facing the <br />backyard will have three (3) windows. Under the window close to the house we will install an <br />AC/Heat unit. All walls will be insulated with R -13 insulation. Drywall %2 inch will be <br />screwed to the studs. The brick wall will be covered in drywall as well. All seams will be taped <br />and three (3) coats of drywall mud will be applied on all seams all drywall will be sanded smooth <br />and two (2) coats of paint will be applied (color up to the customer.) Exterior walls will be <br />trimmed out to match the exterior of the mud room. Any loose paint on the existing wood work <br />will be removed and repainted. <br />Electric: <br />We will install six (6) reset lights, four (4) inside outlets and one (1) outside <br />outlet. A dedicated line will be brought up for the AC/Heat unit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.