My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
September 2014
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2014
>
September 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:20 PM
Creation date
6/8/2020 10:16:40 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001363
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
18599 Mason Street A MAN AND HIS, BUSIVESS COMMITTED TO CHRIST <br />Cassopalis Michigan 49031 <br />-691-5700 <br />Phone:269 <br />Toll Free (866) 217-7663 <br />Fax: 866-276-8344 <br />E-niail: wr2l arant:20,2mail.corn <br />Lijetinle Warrano017 All Labor Performed <br />Elder Jerry Phillips <br />My <br />Ambassador For Christ Church <br />Street Add <br />so""'cl`Yellow Book, S Bend/Mishawaka [" 108-05-2014 <br />JOB LOCATION: <br />773-580-8808 1 <br />---A Ambassador For Christ Church <br />302 West Washington Street, S13 <br />ChicagoPhana Indiana 46601 773-723-5400 <br />. ... ...... . ... <br />Phan <br />E- . Mail .. el.d,e,4ph.il.li.p.spa,ol,...c,o,m.Fax., ....... . . .... ..... ..... ............... <br />Job Description AMOUNT <br />Remove all of the existing shingles, trim, flashing, rotted wood etc on all but the flat roofs.. <br />• <br />Replace any rotted wood planks with new sheathing. Install Rhino synthetic felt over all of the <br />pitched roof areas. Install ice and water dam protection on all gutter edges and in the valleys. <br />Install new gray painted aluminum flashing on all projections except lead pipe boots or equivalent <br />'ORjt fckns VJAX toe- 110,oz- a.39pei- <br />on pipe vents. Install 24 ga gray painted metal W valleys where required. Install Inspire Classic gray <br />class C shingles over all pitched roof areas. Install Inspire hip and ridge on all hips and ridges. <br />Install 1/2"x4x8 insulation board over the wood decking on the flat roofs and secure with plates and screws. <br />Install a TPO roof system over the board. Heat weld all of the seams. The TPO is to run up under the <br />slate 12". All sealants used are considered to have a life of 40 -years (permanent). All nails, and <br />fasteners are stainless. <br />Clean up all debris upon completion. Warrant all labor performed for the life of the material. <br />PAYMENT IS DUE UPON COMPLETION <br />18% PER ANNUM INTEREST IS APPLIED AT 15 DAYS PAST DUE <br />DATE WORK COMPLETED <br />TOTAL JOB COST <br />,NVO�K COMPLETEDBYNE Roofing Soluitions <br />samoe- vvz)\JiCle-6 -115 <br />,;z$172,676.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.