Laserfiche WebLink
peeling paint. Encouraged her to contact Code. Steve Szaday cited this property in his Landmark's <br />minimum maintenance review in 2012. John hasn't performed any of the work. HPC will follow <br />up with Code after on-site visit to document the property. <br />29 August Routine Office work. Followed up on riverside Drive with Steve Szaday. The <br />exterior of the house is brick on the first storey, clapboard on the second storey and cedar shakes in <br />the gable all in good condition. Routine maintenance with re -pointing the mortar where needed <br />and painting the rest. Interior original door to be repaired; exterior security door to be installed <br />with single pane per staff approval. Spoke with Gene Forsythe about roof repair on 216 Navarre, <br />gave him the paperwork for RME to repair NE corner with architectural shingles—major water <br />issue—plans to replace rest of roof with same. Nancy Ickler proposed replacing her front door at <br />1402 E. Wayne and hoped that I could Staff Approve it. She e-mailed a scanned copy of the <br />proposed door, I photographed the current door from the street and then requested a closer look <br />at the door. After inspecting the door and realizing that the entire original entry door system would <br />be removed and replaced, I showed my photographs and Nancy's proposal to Kevin Buccellato <br />and he agreed that this proposal would have to go before die Commission. E-mailed Nancy with <br />response. <br />30 August Bus Tour of Local Historic Districts for Holy Cross Village. Routine Office <br />Work. Eric stopped in with the following update for Local Landmark 1240 Thomas <br />Firehouse #4: <br />The reassessment on Fire House #4 was dropped from $62,700. to $14,000. <br />He is applying for re -zoning from MU to 0 Office <br />Quotes from South Bend Roofing is $23,650. and does not include decking. (Thought <br />that odd.) <br />Landscaping estimates from Jonothan Geels $600.-2,000. Eric is not going to use. <br />David Relos said that Eric would be eligible for Redevelopment money and he needs to <br />prepare the proposal. <br />Fire on Marion Street. House not in district but back yard is in North St. Joseph LHD-the site of <br />John Friedline's rental that had to be demolished. 8 or 9 ND women LaCrosse team members just <br />moved in earlier that week. Fire started with propane tank that was improperly installed and the <br />grill may have been too close to the vinyl covered house.—Spoke-with property manager,, Scott,, gave <br />him my card and encouraged him to contact the Office. <br />2 September - LABOR DAY OFFICE CLOSED <br />3 September VACATION DAY <br />4 September Prepared COA Stall' Report for 1313 W. Wayne S.; reviewed Steve's report on <br />1430 E. Wayne door which he determined is deteriorated beyond repair. Homeowners have <br />decided to wait until Spring to apply for COA for its replacement. Researched home located at <br />315 Corby for Ellen Licina and provided her with information and scanned images from the 1987 <br />Survey negatives. Caught up on paperwork. <br />5 September Gave "Then and Now" tour to Community Investment Department between noon <br />and 1:00. Routine Office work. WNDU interview at 614 Sherman for landscaping award. Karen <br />White, Mayor and some of his Office Staff were also there, along with contractors who did the <br />work. Steve Szaday arranged for the donations of concrete and paint. <br />6 September Coordinating meeting dates and times with CID/Parks/HPC for 2 way Streets <br />discussion and AECOM—Leeper Park will be an issue. Gave "Then and Now " Tour for First <br />Friday between 6:00-8:00 for 15 people. <br />