My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
July 2013
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2013
>
July 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:19 PM
Creation date
6/8/2020 10:16:05 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001363
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
June 14, 2013 <br />Submitted to: <br />Lawyers Title Company, LLC <br />Attn: Beth Housand <br />Fax: 574-257-2751 <br />Phone: 574-257-2711 <br />Eli7zibetli.housand�il,itic.coin <br />Property Address: <br />801 Park Ave. <br />South Bend, IN. 46616 <br />ROOFING AND RESTORATION, INC. <br />1703 South Ironwood - South Bend. IN 46613 <br />Phone 5741233-7485 <br />Fax 5741233-7531 <br />slatile,ftcorncast.net <br />1. Existina Conditions of Sloped Roof Areas. <br />- <br />1. The roof consists of multiple sections of 12/12 pitch gable roofs. Decking is wood, open <br />slat design. Base roofing material is cedar shake. Second layer material is asbestos tile. <br />a. The asbestos tiles are past the serviceable life of the material. The tile are severely <br />pitted and worn. There is a buildup of moss and algae on the slates, further <br />depredating the integrity of the slates. <br />b. There is no step flashing at any of the wall terminations. Some terminations have <br />been caulked in the past; the caulking is cracked and delaminating. <br />c. Some of the pipe penetrations are missing proper flashings. <br />2. The front porch roof consists of an older 3 -tab asphalt shingle over a wood deck. <br />a. There are a few missing shingles. Misc. cracks and nail pops are noticeable. <br />3. The bay windows have asphalt roll roofing that appears to be in good condition. <br />4. The rear low slope roof consists of granulated modified bitumen roll roofing with <br />exposed roofing nail fasteners. The exposed nails are swing to rust and loosen. <br />5. The garage roof is installed with 3 )-tab asphalt shingles. This roof appears to be in good <br />condition. <br />6. The sheet metal valleys are in serviceable condition. <br />7. The gutters and downspouts appear to be in serviceable condition. However, the <br />mounting brackets are fastened on the outside of the roofing. This is an incorrect method <br />of attaching gutters, due to likely leaking at the nail fasteners. <br />U <br />ESTABLISHED 1924 <br />ROOFING — MASONRY RESTORATION — SHEFT METAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.