My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
August 2013
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2013
>
August 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:19 PM
Creation date
6/8/2020 10:15:58 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001363
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR <br />DEPARTMENT OF PUBLIC WORKS <br />Dear Resident / Business: <br />Please be advised that Riverside Dr., from .Angela Blvd. to Leland Ave, <br />is scheduled for reconstruction beginning Wednesday, July 31s through <br />Tuesday, August 6 t h barring any unforeseen mechanical breakdowns or <br />inclement weather. The reconstruction scheduled involves the scarification or <br />grinding off of asphalt to a minimum depth of 2% inches (beginning <br />Wednesday, July 31 repairing all existing manholes and catch basins, base <br />repair of extremely deteriorated areas, and completing the project by <br />resurfacing with asphalt. Resurfacing of asphalt is scheduled for Tuesday, <br />August 6 , which will require a total closure of any vehicle traffic while the <br />surface course is applied. Traffic will be detoured to use Portage Ave. We <br />regret any inconvenience this may cause, but this work is necessary to maintain <br />the quality and extend the life of the street. Parking will be restricted or <br />banned on the roadway during these dates, to allow crews the opportunity to <br />perform the needed repairs. Please -make any necessary arrangements to <br />alleviate the impact this construction may have on your business / travels, <br />Again, the time period of restricted traffic will be approximately 6:00 A.M. to <br />6.00 P.M. Wednesday, July 31"; and through Tuesday, August 6 th . Thank <br />you in advance for your cooperation, and if any additional information is <br />requested please call: <br />Marcia Qualls / Customer Service Coordinator / 235 -5939 <br />
The URL can be used to link to this page
Your browser does not support the video tag.