My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
April 2013
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2013
>
April 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:19 PM
Creation date
6/8/2020 10:15:56 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001363
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />ASHTON CONSTRUCTION LLC <br />55790 Apple Road <br />Osceola, IN 46561 <br />Phone: (574) 674 -9300 FAX: (574) 674 -9308 <br />C I -IANGE ORDER <br />JOB NO: Proposal Dated 9/27/12 <br />DATE: March 4, 2013 <br />Customer: Alexander & Laurie Martin <br />Address: 1201 E. Wayne Street North <br />City, State and Zip Code: South Bend, IN 46615 <br />Type Of Work: Screened In Porch <br />You are hereby authorized to make the following change in your work on the above captioned <br />project, it being understood that this change is to be executed under the terms of and conditions <br />embodied in our contract. <br />AV aNcw5d:_: ;vtcrt oe a.��zsrn�.4V <br />Total Screened In Porch Proposal Dated 9/27/12 $16,067.00 <br />Deletions From Proposal As Follows: <br />1. Installation of /4" paneling to interior of addition. (725.00) <br />2. Installation of cedar deck boards to floor of addition. (1,150.00) <br />3. Installation of 5/8" T -111 to exterior of addition. (968.00) <br />Total Deletions From Proposal Per This Change Order (2,843.00) <br />Additions To Proposal As Follows: <br />1. 12% increase in rooting material cost. <br />102.00 <br />2. Installation of l - 3'x3' skylight to center of addition roof. <br />1.,117.00 <br />3. Install cedar 8" V- Groove smooth finish. Product to be installed <br />raw, homeowner to decide on finish. This cost does not include <br />finishing of this product. <br />3,345.00 <br />4. Installation of 5/4" wolmanized deck boards to floor of addition. <br />950.00 <br />6. Installation of cedar 6" cove siding to exterior of addition. <br />This cedar to be ordered pre - finished. <br />2.348.00 <br />Total Additions To Proposal Per This Change Order <br />7.862.00 <br />'Dotal Amended Screened In Porch Pro er This Change Order <br />$21,086.00 <br />Authorized C'ontractor's Signature ,' <br />Customer's Signature <br />Customer's Signature <br />Date Of Acceptance <br />
The URL can be used to link to this page
Your browser does not support the video tag.