My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
September 2012
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2012
>
September 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:19 PM
Creation date
6/8/2020 10:15:52 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001363
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Option 4 <br />Remove and repair as necessary including glaze and spall repairs and re- <br />install on existing building sub -structure. Work includes all new steel <br />lintels, framing and anchorina devices caulking and sealants, for all areas of <br />terra cotta veneer units. Prior to removal, the facade is to be photo -documented, <br />with all units to be inventoried and original locations recorded. <br />Cost $198,500.00 <br />Add estimated allowance for repair and reinforcement of masonry sub -structure, <br />including steel and masonry replacement as required. <br />Cost $120,000.00 <br />Total cost $318,500.00 <br />By (5<0 r671W (�Z 'l ffliny <br />Lawrence L. Darling, Senior Project Manager <br />For The Grunwell-Cashero Co., Inc. <br />ACCEPTANCE <br />For St. Joseph County Public Library <br />September 6, 2012 <br />Date <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.