My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
November 2011
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2011
>
November 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:19 PM
Creation date
6/8/2020 10:15:17 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001362
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,/ <br />PROJECT NARRATIVE <br />Michigan Street Lift Station Replacement <br />City of South Bend, Indiana <br />City Project No.: 111-008 <br />DLZ Project No.: 1161-5064-50 <br />The Michigan Street Lift Station Replacement project will include the construction of a new <br />combined sewer pumping station to replace the existing station currently located in front of the <br />North Water Treatment Plant, along Michigan Street in South Bend, Indiana. The new pumping <br />station will be located approximately 85 feet north of its current location, within Leeper Park. <br />The new pumping station will be installed as a below grade structure and will include a concrete <br />drive to allow access to the station by City maintenance crews. The only element to the pumping <br />station that will be above grade is the control panel, which will be approximately 4 feet wide,1 <br />foot deep and approximately_ 5 feet high. <br />The location of the new pumping station currently consists of an ornamental fence that is in a <br />state of significant degradation and has been overtaken by vegetative overgrowth. It is <br />understood that the ornamental fence used to be an entry way to a historical "fragrance garden" <br />located within Leeper Park. Confirmation of this is an existing monument near the area of the <br />fence and the proposed new pumping station. <br />To revive this portion of Leeper Park and screen the new pumping station, the project will. <br />include the construction of a landscaped area around the new pumping station that will be <br />populated by a variety of plantings (shrubs, perennials, bulbs and ground cover). In addition to <br />the new landscaping, the project will also include the construction of a new concrete and paver <br />walkway to the restored fragrance garden monument. The project will also include an alternate <br />for the restoration and relocation of the existing ornamental fence. <br />
The URL can be used to link to this page
Your browser does not support the video tag.