My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
September 2010
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2010
>
September 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:18 PM
Creation date
6/8/2020 10:14:48 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001362
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C1n11., items supplied and installed by Peacock & Companv or work <br />completed by Peacock & Companv will be covered by our two (2) near <br />tivarranty. <br />Terms <br />30% Down <br />35% Upon completion of demolition work. <br />30% Upon completion of Granite top installation. <br />Balance due upon completion. <br />3) 3 -SEASON ROOM <br />Demolition and Modification of Existing <br />We will remove existing windows; door; knee walls; wall material from <br />house to corner columns (concrete floor to header beam) and corner column <br />to corner column (concrete floor to header beam). Existing ceiling will <br />rernain intact. <br />Walls <br />The walls will be conventionally built using 2x4 studs set 16" on center <br />sandwiched between a single treated base plate and a single top plate, with <br />R-13 insulation installed in all open stud pockets. There will be 7/16" <br />oriented strand board (OSB) applied to the exterior walls along with a layer <br />of Tyvek house wrap. Paint grade trim will fill in the unfinished areas <br />around the new windows while cedar shakes will be installed below the <br />windows to match the existing siding as closely as possible. <br />Interior Walls and Ceiling <br />We will install 1/2" sheetrock (using glue and fasteners) to the walls only <br />and finish them with tape and three (3) coats of joint compound. The <br />ceiling will be sanded and repainted along with the rest of the room. <br />Windows and Doors <br />- Two (2) 79" x 64 7/8" Marvin "Ultimate" Double Hung; Stone White; <br />Upper Grilles Only; Low -E 366 With Argon; Five Wide Unit. <br />- One (1) 181 7/8" x 64 7/8" Marvin "Ultimate" Double Hung; Stone <br />White; Upper Grilles Only; Low -E 366 With Argon; Two Wide Unit. <br />Initial 8 <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.