My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
September 2009
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes and Recordings
>
HPC Meeting Minutes 2009
>
September 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:18 PM
Creation date
6/8/2020 10:14:15 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001362
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Followed up with Commissioner Thomas on his response to posting the Assistant <br />Director position. <br />August 26 On-site inspection for 106 Review in Woodland. Spoke with Elaine <br />Meyer Lee concerning COA#2009-0601 for 809 Forest in Chapin Park. The fence <br />approved was for "treated wooden spaced French Gothic Fence..." the French Gothic <br />style does not come in treated wood only in cedar. The fence will be installed as <br />French Gothic in cedar. I met with Mikki Dobski Shidler concerning the lights on <br />Leeper Park Bridge. As part of a Breast Cancer Awareness Month the City would like <br />to "change" the lighting to pink during October. Depending upon the financing the <br />Engineering Department thinks that either the top globe of each light or all of the <br />globes could be covered with a temporary, removable pink film. She said that she had <br />already spoken with Todd Zeiger and he didn't have an issue with the proposal and he <br />told her to contact HPC. The proposed pink lighting would be temporary and if the <br />bottom globes were also to be covered the accumulated bugs were requested to be <br />emptied from the globes. <br />August 27 Physical inspection of HPC archived boxes at St. Joseph County <br />Archives for appropriate disposal of contents per Retention regulations. <br />August 31 * Prepared balance of August fees for Auditor's and Treasurer's Office. <br />On site COA visit on Forest. <br />September 1 On site COA visit to 1515 E. Wayne and 1307 E. Wayne. <br />September 3 - Provided background information and research time for Prof. Uplekar's <br />Historic Preservation Class project at Zion'United Church of Christ. Interviewed by <br />ABC/Fox News on re -opening of the Conservatories on Labor Day. <br />September 4 On site visits for three COAs on Riverside Drive. <br />September 9 Attended ATC Physicians -St. Joseph County Department Head meeting <br />at County -City Building. <br />September 10-20 Vacation <br />""September 15 Office received response to my inquiry from John Murphy, City <br />Controller, that the $25,000.00 for HPC is in the 2010 City Budget.***** <br />
The URL can be used to link to this page
Your browser does not support the video tag.