My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
November 2008
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2008
>
November 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:18 PM
Creation date
6/8/2020 10:13:41 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001361
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
November 6, 2008 <br />St. Joseph County/ <br />South Bend Historic Preservation Commission <br />125 S. Lafayette Boulevard <br />South Bend, IN. 46601 <br />RE: Project Description Brief <br />Addition and Renovations to Monroe School Building <br />South Bend, Indiana <br />Commission Members: <br />An addition to and renovation of the Monroe School Building is planned. The renovation work will <br />include interior and exterior building and site improvements. This is contained in detail on the <br />Construction Drawings submitted with the Certificate of Appropriateness application. <br />The addition is approximately 17,500 SF and will create an enclosed circulation flow for the main <br />floor level. This addition will abut the south elevation of the 1942 classroom addition and the east <br />elevation of the 1959 building addition. The exterior fagade of the new addition will include design <br />elements of the original 1930 building such as: <br />• Parallel tall walls on two of the elevations topped with a gable profile at steep <br />pitch replicating the original north facade of the 1930 building. <br />• Steep pitched roofs covered with synthetic slate shingles replicating the original <br />building steep roof areas. <br />• Masonry detailing on the exterior facade reflecting the original building design <br />elements. <br />• Masonry materials and colors to compliment the original building. <br />The addition is designed to compliment and maintain the architectural character and style of the <br />original school building construction. The addition will maintain a discernable break to distinguish <br />the different eras of construction. <br />The building exterior/fagade renovation work includes fenestration replacement, entrance system <br />replacement, masonry restoration and repairs, and roof and gutter drainage system replacement. <br />In detail this work is as follows: <br />Replacement of the windows on the main and second levels of the building with <br />thermally broken window units with insulated glass. The site lines and window <br />profiles replicate the steel sash windows of the 1930 building. <br />The lead caming pattern will be retained with the new window installations and <br />where the caming pattern has been removed from the original design, it will be <br />returned in the original diamond pattern for the project. <br />Wood doors are being replaced with aluminum entry doors to update the building <br />egress requirements, but configured to match the original door assembly <br />appearance <br />1120 $ HEM ARCHITECTS, INC 107 N. EDDY ST. SOUTH BEND, IN 46617 (574) 234-8907 fax (574) 234-8908 <br />
The URL can be used to link to this page
Your browser does not support the video tag.