My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 05-16-97
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1990-1999
>
1997
>
RM 05-16-97
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 3:24:00 PM
Creation date
10/8/2012 4:20:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting -May 16, 1997 <br />6. NEW BUSINESS (Cont.) <br />i. continued.... <br />Ms. Kolata noted that the legal description <br />and railroad right -of -way was worked out in <br />terms of buying property in this block. <br />When the design process began for the curb <br />and sidewalk improvements, the Lafayette <br />Street side had some problems. There were <br />no curbs and it didn't quiet line up with the <br />block north of Broadway. In order to put in <br />the curb, they had to reengineer the street in <br />terms of the drainage and the location for <br />the curb. <br />Ms. Kolata noted that the Troyer Group <br />stated that because of the revised cost <br />estimate, which is now a little over <br />$200,000, they would like to increase their <br />maximum fee from $10,350 to $14,587. <br />Ms. Kolata noted that this is still the same <br />7.2% percentage of construction cost. She <br />noted that this was reviewed with Carl <br />Littrell and he felt that this is a reasonable <br />cost. <br />Upon a motion by Ms. Auburn, seconded by <br />Ms. Schwartz and unanimously carried, the <br />Commission approved Amendment No. IV <br />from the Troyer Group for engineering <br />design services for property located in the <br />Sample Ewing Development Area. <br />j. Commission approval requested for <br />proposal from R.E. Pitts and Associates, <br />Inc. for appraisal services in the South <br />Bend Central Development Area. <br />APIN <br />H:\ HOME\ CPHIPPS \WPDATA \COMMSN\051697.MIN -20- <br />COMMISSION APPROVED AMENDMENT NO. IV <br />FROM THE TROYER GROUP FOR ENGINEERING <br />DESIGN SERVICES FOR PROPERTY LOCATED IN THE <br />SAMPLE EWING DEVELOPMENT AREA <br />
The URL can be used to link to this page
Your browser does not support the video tag.