Laserfiche WebLink
Mr. John Oxion <br />Historic Preservation Commission of South Bend & St. Joseph County <br />Re: Oliver Chilled Plow Works <br />Buildings 46 and 47 - Forge 2 <br />March 20, 2002 <br />Page 4 <br />The supported portion of the I" floor slab was found to be in good condition structurally. This study has <br />assumed the basement would be used for storage and that a new elevator system will-be installed to <br />access it. The remainder of the basement will essentially have to be gutted back to the concrete structure <br />as shown in Photos 19 and 20. <br />Building 47 - Roof and Structural Framing <br />The eastern half of the roof of Building 47 can be seen in Photo 21. Water sheds from the roof of the <br />clearstory and collects in a depression at the base of the sloped roof behind the masonry parapet. The <br />water was then originally intended to be collected into a series of internal drains spaced along the <br />perimeter of the east and west walls. An overall view inside the building showing the roof structure is <br />shown in Photo 22. Drains located along the perimeter walls tended to clog and freeze. The drainage <br />system has failed and allowed water, snow and ice to lay in the low points of the roof. Over time not <br />only the roof membrane, but also the wood decking and roof joists have severely deteriorated as shown <br />in Photos 23 through 26. Gaping holes are visible in several areas. To estimate repair costs, we have <br />assumed approximately 1/3 of the sloped roof decking and 1/4 of the 3 x 12 wood joists will have to be <br />replaced. This study assumes new rigid insulation and a fully adhered EPDM roof membrane will then <br />be installed throughout the entire roof including the clearstory. The remainder of the steel and wood <br />structural framing is in reasonably good condition and only spot repairs will be necessary. <br />We understand there is some concern over whether the concrete slab on grade can support some of the <br />equipment that would be displayed in this building. Without knowing the weight of the equipment, we <br />cannot accurately determine whether the existing slab will be sufficient to carry the load. Thickening <br />the slab to form a pedestal for the heaviest equipment may be an economical solution if in fact this does <br />become a problem. <br />Building 46 and 47 - Exterior Masonry and Windows/Doors <br />Most of the monolithic brick masonry walls making up the exterior of the two buildings are well worn <br />but stable. There are only two isolated areas where masonry appears to be bulging outward and <br />potentially be in danger of falling. These areas can easily be removed, the brick salvaged and cleaned, <br />and the masonry walls reconstructed. <br />The remaining deterioration is typical of masonry of this age in an industrial environment. The <br />condition of the mortar joints varies, typically with the amount of water which is available to saturate it. <br />Photo 27 shows a comparison of one location where the mortar is in reasonably good condition to <br />another where it has eroded away to a sand -like consistency within a few feet of each other. The <br />heaviest erosion occurs beneath leaks in the roof /gutter system. In general, the west elevation which <br />receives the brunt of wind driven rain appears to have deteriorated the most severely as shown in Photo <br />28. Areas like that shown in Photo 29 occur throughout both buildings. In these areas both the brick <br />and mortar appear to have eroded. Previous repairs /maintenance to the. masonry have been limited. <br />Spot tuckpointing and brick replacement were observed in a few locations. Photo 30 shows such repairs <br />were typically sloppy and mortar was simply used to butter eroded joints while soft, punky mortar was <br />