My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
September 2002
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2002
>
September 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:23 PM
Creation date
6/8/2020 10:10:57 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001402
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
49-03-2002 2:51AM FROM KIL ARCHITECTURE 216 288 2654 <br />SEP -3-2002 11:50A FROM:MASONRY CONTRACTORS 2192734075 <br />Masonry Contractors Inc. <br />16839 Douglas Rd.- Mishawaka, IN 46545 <br />September 3, 2002 <br />l&, Greg Kil <br />Kit Architecture and Planning. <br />1126 Lincolnway East. <br />South Bend, IN 46601 <br />RE: Oliver School Terra Cotta Salvage Project <br />Dear Greg: <br />TO:2892420 <br />P.2 ' <br />P:2/3 <br />Ph: 219273-4025 <br />Pax 2192734075 <br />E -Mail: sbognar@gatewaynet <br />Masonry Contractors Inc. is pleased to submit this estimate for the salvaging of the Terra <br />Cotta located on the Oliver School Building in South Bend. <br />I have prepared and listed below the budget figures according to the format submitted to <br />me for the pieces to be salvaged. The dollar figure assigned per piece salvaged is a price <br />per each unit,. that is, if you decide to salvage more of one item it is the stated price per <br />unit additional. <br />Listed below is the scope of the work: <br />a. Main Entry, North elev. T.C. Marked "B" upper level crockery' pilaster <br />$2,000.00 each. �,- <br />b. Main Entry, North elev. T.C. marked "C' entry surround crockery& pilaster !L <br />$3000.00 each. <br />c. Main entry, North elev. T.C. marked "D" square medallion at upper parapet,) <br />centered over brick pilaster "Yin/Yang" design. $750.0.0. <br />d. Main entry, North elev. T.C. marked `B" special coping piece. $300.00.eachD <br />e. North Elev. T. C. marked "F" standard coping piece. $75.00..)• ta_ " <br />£ West Elevation T.C. marked "G" upper level crockery. & pilaster $3,000.00 each, rrz . <br />g. South Elev. T.C. marked "IT' "hooded pilaster. $5,000.00. each / <br />Stone Pieces <br />a. Salvage single exterior granite step, marked "r, <br />b. Salvage typical stone sill, Classroom 127, marked "Y' <br />c. Salvage typical piece of chalkboard slate. marked "K" <br />Entrance Archway Reconstruction. <br />r � _ 1 <br />S200;.00 <br />no bid. <br />I-, jv <br />)'%4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.