My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
November 2000
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 2000
>
November 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:22 PM
Creation date
6/8/2020 10:10:12 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001402
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-""' - I I I I I Ili 4 <br />Historic Preservatioti Commission <br />of South Bend and St Joseph County <br />227 West Jefferson Blvd. <br />South Bend IN 46601-1834 <br />Dear Commission review board, <br />2192355595 P.02/02 <br />11-7-00 <br />Allow me to add clarification to the application for the certificate of appropriateness in <br />regards to the abandonment and sealing of wells #6 and #7, and the installation permanent wells <br />2a and 3a to be installed in,Leeper park. <br />The abandonment procedure will be to return the grounds back to the its original state. <br />That is, demolish the concrete base and well 2 feet below grade, covering the area with suitable <br />backfill and hydro -seeding. <br />Sampling of the two test wells indicated in the certificate have provided information that <br />state, the water supply is ample and the constituents treatable. <br />The new well placements have been devised so not to effect any trees in the park They <br />have been laid out in the area of our existing infrastructure ensuring the least amount of <br />detriment to the park due to excavation.Provisions have been made to, seed any trenching that <br />may occur due to piping or electric service. <br />The look of the new wells will be he same as the ones they replace, with one exception, <br />they will be lower in profile, They present wells on the island have a 5 ft, vertical concrete, base <br />from ground level, the new wells will only be 4 ft. tall. The actual concrete base will measure; <br />length Aft. width 7 ft. and 4 ft from ground level. <br />. . If there are any questions please let me know. <br />John Wiltrout <br />South Bend Water Works <br />TOTAL P.02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.