My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
February 1998
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 1998
>
February 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:21 PM
Creation date
6/8/2020 10:09:12 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001401
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. ALLEY ELEVATIONS <br />1. Masonry (Brick) <br />Existing masonry walls will be pointed with mortar to match ma, color, texture, <br />strength and profile of original. Rebuilding of some Palais Royale parapets will be required <br />2. Steel Windows <br />Some existing windows will be restored in place. Some existing windows will be <br />removed and their opening sealed to provide protected exits. Missing windows in openings will not <br />be replaced. Openings will be sealed with bricks to match exiting. Bricks will be set back 4" to <br />provide a blind window thus leaving trace of original design. <br />3. . Demolition <br />Existing (original) stagehouse will be removed to allow for new stagehouse <br />construction. ; <br />4. Theatre Exit Doors <br />Existing (original) exit doors will be replaced with new acoustic doors to meet <br />sound isolation criteria. <br />5. Palms Royale Service Doors <br />Existing (original) metal service doors which are in poor condition will be replaced with new metal <br />service doors at new locations. Existing openings will be sealed with bricks to match existing. Brick <br />will be set back 4" to provide a blind window thus leaving trace of original design. <br />6. Fire Escape <br />S <br />4 Existing (original) fire escape on north elevation of theatre will be restored. <br />Existing (original) fire escape in alley between Palais Royale and Theatre will be removed to allow <br />for construction of a new protected fire exit. <br />� C. ROOF <br />s <br />1. Roofing <br />New roofing will match existing in color on all structures. t; <br />2. Black standing seam metal roofing will be installed on east face of stagehouse to serve as snow <br />deflector per code requirements. <br />S <br />1 <br />?.. ww.a..:..rnnya3c9tMrttAta.au..s*-.maw:xa.arw--........ww.nnw.[-m'.mt-.awwN.cK+.ut'nrw'w.1..wF.cM'aeL+Vc-1tait�.+YM.'*+aaw...a.e�nar.u.t. a.-v.n'.- 1 r.J <br />- KESSLER <br />ASSOCIATES INC <br />ARCHITECTS - <br />It <br />
The URL can be used to link to this page
Your browser does not support the video tag.