Laserfiche WebLink
MINUTES 6F REGULAR MEETING. <br />of the <br />HISTORIC PRESERVATION COMMISSION <br />Regular Monthly Meeting <br />7:30 p.m. County Commissioner's- Conference Room <br />Monday March 2, 1998, 7th F1oor.County- City_.Building <br />I. Call to Order <br />John Oxian, President of the commission, -brought the meeting to at 7:30 _ <br />p.m. <br />II. Roll Call <br />.Commission members present were: Adrian Fine,' Catherine Hostetler; John Oxian, <br />.Janeanne..Petrass, and,Jerry.Wiener. <br />Commission staff-'present .were: David Duvall,- Director, -and Aladean DeRose, <br />Counsel. <br />Also attending the ,meeting-'were: Cleo Hickey - Director of the Morris <br />Performing.- Arts.. Center, Theo - Pappas and John.- Krasinkiewicz - Kessler <br />Associates, Sue Collier, and Loveda Jones., <br />.III. Public Hearing <br />I I A. Certificates of Appropriateness <br />J 1. 1998 -0129 - 211 N. Michigan <br />Mr. Duvall,`noted that the Staff Report.,,had been. read into .the minutes of the , <br />previous meeting.as. -a .committee of the whole -and distributed, photographs, <br />drawings, etc. Mr. Pappas : presented .the. architects .drawings_ with concrete <br />samples and color- pallet. He noted that - construction of the new stagehouse . <br />would, follow. the historical precedent of the. previous structure as an <br />unadorned functional ..form. S.ignage- -be; inscribed..in a panel - section to. <br />identify .the. building. from- .Main,Street. The .front elevation is to be altered <br />..by removing, the, existing..Marquee'and replacing it with a new marquee modeled <br />after'the patterns of,the historical- original but with fewer bays of canopy.. <br />Terra cotta and other 'facade treatments- will be very.' limited to- necessary <br />repairs. Existing windows are,to remain,,again with minimal repairs..' <br />The plan will provide truck access from Main Street. The small pedestrian <br />alley between .. the Morris and' Palais at ....the alley will be enclosed and <br />.;....incorporated into the ,egress. plan for the. auditorium..' The new_ stagehouse will <br />be 'a ppr`oximately--.80.-feet.- Mall.. It will. -..be- floodlighted to illuminate the <br />engraved signage . which,. will be.... in .a.,_smooth section at the upper-right <br />which ,contralsts,_with, the . texture, of the general- building - block. <br />Temporary, signage.. at. -the rear ..for ,.shows: will-.- be . accommodated- by, mounting <br />eyelets . behind.,�.ah_ h— <br />parapet temporary signage, ,.opportunity .might be <br />af forded .,at the,,screenwalls which.- shield mechanical - equipment. Discussion, of <br />the ,method of .illumination..for, this signage .1ed .to the establishment of up to <br />-eight concealed light fixtures for this purpose. <br />At the. -North side...:of, the building_.. existing •flush metal doors - .are. --.to be <br />-replaced -,with similar -flush metal doors possessing, greater acoustical <br />insulation properties. <br />