My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
October 1997
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 1997
>
October 1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 1:16:21 PM
Creation date
6/8/2020 10:08:58 AM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
BOLT Control Number
1001401
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO: Historic Preservation Commission of South Bend & St. Joe Cty. <br />FROM: Norman & Linda Riley <br />1326 East Wayne North <br />South Bend, IN 46615 <br />DATE: October 2, 1997 <br />We propose to replace all existing sheet metal gutters and downspouts <br />with continuous aluminum material gutters and downspouts. <br />We received three (3) estimates to replace the sheet metal gutter on the <br />back of the garage (Photo # 1); and the three (3) sheet metal downspouts <br />(Photo # 2). The estimates were $1,250.00 to $1,350. 00. <br />We received an estimate to replace ALL gutters and downspouts on the <br />house and garage in continuous aluminum material for around $1050.00. <br />As you can see on our addition built prior to 1985 (Photo # 3) there are <br />continuous aluminum gutters. <br />Photo # 4 shows the front of the house with the sheet metal gutters and <br />downspouts. <br />Due to the exorbitant cost of replacing with like materials we request <br />permission to replace the gutters and downspouts with continuous <br />aluminum material. <br />Thank you for your consideration in this matter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.