Laserfiche WebLink
SUNCtinter <br />unci! 803 North Notre Daxne <br />South Benda IN 4661? <br />(21.9)239-9675 <br />TO: HISTORIC PRESERVATION COMMISSION <br />FROM: NORTHEAST NEIGHBORHOOD COUNCIL <br />DATE: NOVEMBER 15, 1993 <br />SUBJECT: REQUEST FOR APPROVAL OF RENOVATION OF COMMUNITY CENTER <br />803 N. NOTRE DAME AVENUE <br />The Northeast Neighborhood Council in association with the City of South Bend, Neighborhood Housing <br />Services of South Bend, and South Bend Heritage Foundation, is beginning and renovation effort on the <br />local historic landmark at 803 N. Notre Dame Avenue. <br />The first phase of improvements will be aimed at exterior stabilization and reconstruction of portions of the <br />building. The building has lasted for 100 years, we want to repair and reconstruct areas so that we can <br />get a good start on lasting another 100 years. On the exterior we intend to replace broken or damaged <br />• material in the same style and with the same type of materials as are on the building today. There are 3 <br />exceptions to this. <br />1. We are receiving bids for repair and replacement of the slate roof. Slate is sloughing off onto the <br />ground, there are leaks into the interior of the building. The building roof needs substantial work. Due to <br />cost concerns, we would like to be able to replace the slate roof with an attractive, appropriate asphalt <br />shingle such as Certainteed Grand Manner. Attached as an appendix to this document are bids received <br />for this work. <br />One of the bids received for the slate roof is lower than the asphalt roof bids from Midland. We have not <br />had time to examine the work of this company. If the work appears well done, we propose to go ahead <br />with this company's bid and complete the roof in slate. However, we cannot guarantee this Until a later <br />date, which is why we are asking for the waiver. <br />2. We are also receiving bids for repair and replacement of gutters. The existing built in gutters are a <br />problem in terms of maintenance and cost of repair (as evidenced by the bid received from Midland). We <br />request approval to deck them over and replace with half round attached gutters. These gutters would be <br />of the period of the firestation, but would be a change from what exists today. <br />3. We are also requesting approval to change slightly the built-in garage door. We would like to replace <br />the door with a wooden wall which would increase the amount of glass area. Instead of two rows of glass <br />squares, we would like 3. We would also like to weatherize the wall, however this would be interior work <br />and would not show up on the exterior. <br />0 <br />