My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to Owner-Engineer Agreement - Additional Design and Construction Services for WWTP – Black & Veatch Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to Owner-Engineer Agreement - Additional Design and Construction Services for WWTP – Black & Veatch Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:38:16 AM
Creation date
5/27/2020 9:53:15 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/26/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated May 26, 2020 <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />C. Engineer: Black & Veatch Corporation <br />d. Project: Wastewater Treatment Plant Electrical Improvements Design and <br />Construction Phase Services <br />2. Description of Modifications: <br />a. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: <br />Task 104 — Design and Contract Document Preparation <br />Engineer shall prepare Contract Documents for the addition of drainage piping <br />and grading from the depression south of the Reuse Building to the manhole near <br />the previous Nitrification Towers. <br />Task 202 — Construction Administration <br />As is indicated in Paragraph 7.05 from the General Conditions for the <br />Construction Contract, Engineer shall be reimbursed for costs associated with <br />evaluating the Contractor's proposed substitution requests. Engineer reviewed the <br />below requests submitted by the Contractor: <br />1. Deviation 2 — Alternative Routing and Installation of Conduits for <br />SESWGR-1 <br />2. Deviation 3 — Alternative Routing and Installation of Conduits for <br />NESWGR-5 & 6 <br />3. Value Engineering Ideas for the Generator and Switchgear (nine in <br />total) submitted via email on April 29, 2019. <br />Additional responses to Requests for Information (RFIs) submitted by the Owner <br />or Contractor. The original scope included 30 RFIs. An additional 20 RFIs are <br />expected to be submitted by the Contractor resulting in a total number of 50 RFIs. <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright C0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.