My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 10-21-94
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1990-1999
>
1994
>
RM 10-21-94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 3:52:26 PM
Creation date
10/8/2012 10:57:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting - October 21, 1994 <br />c. Preparation of Parcel #19: $11,000.00* 4.There is no cost estimate for the proposed <br />development. <br />d. Running Water & Sewer: $7,000.00* <br />e. Demo & fill 815 S. Lafayette: $7,000.00* <br />Total City Expense: $59,386.30 <br />* These are estimates from the City of <br />South Bend, Engineering Department. <br />The Firefighter's Federal Credit Union <br />proposal estimates are slightly differ <br />from Engineering estimates. <br />NIPSCO pipe move$26,794.00 <br />Phone conduit move$7,592.30 <br />Preparation of Parcel #19$12,555.00 <br />Utilities [by Lykowski]$4,000.00 <br />Demo and infill [815 S. Lafayette] <br />$4,670.00 <br />Total $55,611.30 <br />Mr. Masters, representing the Firefighter's <br />Federal Credit Union, noted that the Credit <br />Union's proposal was submitted on <br />September 1. It was submitted in <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.