My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 03-04-94
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1990-1999
>
1994
>
RM 03-04-94
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 3:58:43 PM
Creation date
10/5/2012 4:42:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting - March 4, 1994 <br />6. NEW BUSINESS (Cont.) <br />f. continued... <br />Upon a motion by Mr. Faccenda, seconded <br />by Mr. Donoho and unanimously carried, the <br />Commission approved the Loan in connection <br />with the West Washington Rehab Loan <br />Program for property located at 931 W. <br />LaSalle. <br />g. Commission approval requested for <br />Amendment No. 3 to Contract with The <br />Troyer Group for professional engineering <br />services in the Studebaker Corridor portion <br />of the Sample-Ewing g evelopment Area. <br />Mrs. Kolata explained that The Troyer Group <br />was previously commissioned to perform a <br />capital improvements study and <br />recommendations for the Studebaker <br />Corridor. They have also provided <br />construction specifications for several <br />projects. This Amendment to Contract <br />engages The Troyer Group to provide <br />construction specifications for curbs and <br />sidewalks for the block bounded by Indiana, <br />Lafayette, Broadway and Main. This is the <br />block that contains American Medical <br />Oxygen, Old Fort Building Supply, and The <br />Ridge Company. The curbs and sidewalks in <br />that block are deplorable. With the new <br />investment by American Medical Oxygen and <br />Old Fort, the staff recommends preparing the <br />construction drawings to replace the curb and <br />sidewalk there. The proposal is for a not to <br />exceed fee of $10,350. They expect their <br />actual costs will be closer to $8,000, but the <br />NTE is based on a percentage (7.2 %) of the <br />proposed construction cost. Engineering has <br />-9- <br />COMMISSION APPROVED THE LOAN IN <br />CONNECTION WITH THE WEST <br />WASHINGTON REHAB LOAN PROGRAM FOR <br />PROPERTY LOCATED AT 931 W. LASALLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.