Laserfiche WebLink
BID/PROPOSAL��E: <br />CITY OF SOUTH BEND <br />Project Name: 2020 Curb and Sidewalk Construction <br />Project Number: 120-001 <br />For Bids Due: May 12, 2020 at 9:30am Local Time — see https://southbendin.gov/bids for <br />electronic bid submission information <br />Contractor Name: AEAgruo? enDA)C- RY- <br />DIVISION B2 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />70 <br />SYS <br />A' 2-irige- <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />70 <br />SYS <br />� <br />3 <br />CONCRETE CURB, REMOVE <br />100 <br />LIFT <br />/ .� <br />4 <br />CONCRETE CURB, MODIFIED <br />100 <br />LFT <br />5,Z <br />5 <br />CONCRETE APPROACH, REMOVE <br />30 <br />SYS <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />30 <br />SYS <br />®�{ <br />7 <br />TOPSOIL AND SEEDING <br />60 <br />SYS <br />J " <br />yo jae- <br />10 <br />TREE, REMOVE, 18 IN <br />1 <br />EA <br />® 40 <br />0 <br />11 <br />TREE, REMOVE, 30 IN <br />1 <br />EA <br />4A80 <br />p ,0 <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, 2- <br />IN TO 2.5 IN <br />2 <br />EA <br />DIVISION B3 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />100 <br />SYS <br />e� <br />3, ® 0 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />100 <br />SYS <br />&1Z <br />($00 <br />3 <br />CONCRETE CURB, REMOVE <br />140 <br />LFT <br />3. 9,70-!2E� <br />4 <br />CONCRETE CURB, MODIFIED <br />140 <br />LFT <br />61 P 70 <br />7 <br />TOPSOIL AND SEEDING <br />80 <br />SYS <br />It <br />5'170 <br />10 <br />TREE, REMOVE, 18 IN <br />1 <br />EA <br />s2 <br />11 <br />TREE, REMOVE, 30 IN <br />3 <br />EA <br />0 ea - <br />soc, <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, 2- <br />IN TO2.5IN <br />4 <br />EA <br />CPO <br />15 <br />CURB RAMP, REMOVE <br />16 <br />SYS <br />7� <br />16 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />16 <br />SYS <br />DIVISION B3 TOTAL <br />DIVISION C1 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />100 <br />SYS <br />07-- <br />9 �- <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />100 <br />SYS <br />-7/ ate' <br />3 <br />CONCRETE CURB, REMOVE <br />160 <br />LFT <br />4 <br />CONCRETE CURB, MODIFIED <br />160 <br />LFT <br />- % <br />5 <br />CONCRETE APPROACH, REMOVE <br />20 <br />SYS <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />20 <br />SYS <br />7 <br />TOPSOIL AND SEEDING <br />35 <br />SYS <br />7 <br />10 <br />TREE, REMOVE, 18 IN <br />2 <br />EA <br />-1 <br />11 <br />TREE, REMOVE, 30 IN <br />1 <br />EA <br />13 <br />STUMP, REMOVE <br />1 <br />EA <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, 2- <br />IN TO 2.5 IN <br />4 <br />EA <br />5y® <br />15 <br />CURB RAMP, REMOVE <br />16 <br />SYS <br />q <br />-0- <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />16 <br />SYS <br />DIVISION C1 TOTAL' 3 5 21 <br />Version 01/29/2020 Contractor's Bid for Public Works - 8 <br />