Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2020 Curb and Sidewalk Construction <br />Project Number: 120-001 <br />For Bids Due: May 12, 2020 at 9:30am Local Time — see https:lisouthbendin.gov/bids for <br />electronic bid submission information <br />Contractor Name: PA E 01 rat 01 cf6,N TE 5 kX0, <br />DIVISION Al <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />350 <br />SYS <br />7.- <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />350 <br />SYS <br />3 <br />CONCRETE CURB, REMOVE <br />630 <br />LFT <br />4 <br />CONCRETE CURB, MODIFIED <br />630 <br />LFT <br />o <br />5 <br />CONCRETE APPROACH, REMOVE <br />25 <br />SYS <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />25 <br />SYS <br />2- <br />7 <br />TOPSOIL AND SEEDING <br />28 <br />SYS <br />®& <br />DIVISION Al TOTAL <br />DIVISION A2 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />200 <br />SYS <br />169 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />200 <br />SYS <br /><10 <br />3 <br />CONCRETE CURB, REMOVE <br />320 <br />LFT <br />2 1 e <br />4 <br />CONCRETE CURB, MODIFIED <br />320 <br />LFT <br />5� 9' <br />7 <br />TOPSOIL AND SEEDING <br />180 <br />SYS <br />,2aea <br />11 <br />TREE, REMOVE, 30 IN <br />1 <br />EA <br />a?— <br />12 <br />TREE, REMOVE, 48 IN <br />1 <br />EA <br />13 <br />STUMP, REMOVE <br />2 <br />EARao <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, 2- <br />IN TO 2.5 IN <br />4 <br />EA <br />7,1® <br />15 <br />CURB RAMP, REMOVE 1 <br />16 1 <br />SYS <br />C)? <br />17 <br />PAIRED PERPENDICULAR CURB RAMP 1 <br />16 1 <br />SYS <br />q <br />j. e> i <br />DIVISION A2 TOTAL <br />DIVISION B1 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />405 <br />SYS <br />�2 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />405 <br />SYS <br />®/® <br />3 <br />CONCRETE CURB, REMOVE <br />210 <br />LFT <br />Z0 e� <br />4 <br />CONCRETE CURB, MODIFIED <br />210 <br />LFT <br />! <br />5 <br />CONCRETE APPROACH, REMOVE <br />13 <br />SYS <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />13 <br />SYS <br />b <br />7 <br />TOPSOIL AND SEEDING <br />120 <br />SYS <br />6 <br />11 <br />TREE, REMOVE, 30 IN <br />1 <br />EA <br />13 <br />STUMP, REMOVE <br />1 <br />EA <br />15 <br />CURB RAMP, REMOVE <br />56 <br />SYS <br />Z <br />17 <br />PAIRED PERPENDICULAR CURB RAMP <br />40 <br />SYS <br />-22 <br />®®/o <br />DIVISION B1 TOTAL (®(�"- <br />Version 01/29/2020 Contractor's Bid for Public Works - 7 <br />