Laserfiche WebLink
<br />Appendix "A" is amended as follows: <br /> <br />1. ADD to Task 1 The CONSULTANT shall develop a Note to File for the approved Environmental <br />Assessment (Category Exclusion-Level 2) services for this project. All work shall comply and be <br />in accordance with INDOT's Procedural Manual for Preparing Environmental Studies and <br />Categorical Exclusion Manual, INDOT comments received, and directed revisions required. <br /> <br />2. ADD to Task 3 Road Design and Plan Development The CONSULTANT shall end the project <br />north limit approximately 500 feet south encompassing the existing railroad crossing for a <br />separately constructed project phase. Revisions shall address storm sewer networks, project <br />transitions, pavement markings, walks, public road approaches, quantities, estimates, special <br />provisions and other contract document information in accordance with INDOT policies and <br />procedures. <br /> <br />3. ADD to Task 4 - Utility Coordination Services - The CONSULTANT shall work with LPA utilities to <br />develop utility relocation plans, review existing records, and perform as a liaison to develop work <br />plans and necessary revisions to secure Utility Coordination Certification. <br /> <br />4. ADD to Task 7 Right-of-way Plan Development The CONSULTANT shall make necessary <br />revisions to railroad parcel properties based on current property interests held to accurately <br />reflect land acquisition and present existing right-of-way. The CONSULTANT shall also provide <br />additional coordination activities as may be required to satisfy railroad property interests, <br />attorneys, and consulting engineers. <br /> <br />Appendix "D" is amended as follows: <br /> <br />A. 1. The consultant shall receive payment for the work performed under this contract the total <br />amount not to exceed is $210,000 $481,000 $495,525 unless an amendment is executed by the <br />parties which increases the maximum amount payable and funding approval. <br /> <br />2. The CONSULTANT shall be paid for the work performed under this Contract on a lump sum <br />basis in accordance with the following fees: <br />a. Environmental Document Preparation Appendix "A" Task 1 $ 18,500.00 $22,900.00 <br />b. Topographic Survey Appendix "A" Task 2 38,300.00 <br />c. Road Design & Plan Development Appendix "A" Tasks 3 260,050.00 263,625.00 <br />d. Geotechnical Services Appendix "A" Task 5 18,100.00 <br />e. Design Hearing/Public Involvement 5,700.00 <br /> Total $ 340,650.00 $ 348,625.00 <br /> <br />3. The CONSULTANT will be paid for the services described in Task 4 and Task 8 of Appendix <br />performed by essential personnel exclusively working on these tasks at the direct wage and <br />salary rates of each employee multiplied by 3.135, PLUS direct non-salary costs as approved by <br />the LPA. The direct labor rates shall not exceed the INDOT maximum applicable at the time of <br />service. The maximum allowable rate is available on the INDOT website. Direct non-salary costs <br />shall be the actual out-of-pocket expenses of the CONSULTANT directly attributable to this <br />Contract, such as fares, subsistence, mileage, equipment rentals, reproductions, approved sub- <br /> Page 2 of 3 <br /> <br />