My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to Agreement - Separating Olive Street Reconstruction into Two (2) Construction Phases - Lawson-Fisher Assoc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to Agreement - Separating Olive Street Reconstruction into Two (2) Construction Phases - Lawson-Fisher Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 3:51:40 PM
Creation date
4/16/2020 3:51:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract Amendment No. 2 <br /> <br />Project: Olive Street Reconstruction Phase 1 <br />From Prairie Avenue to 220 ft north of railroad south of Tucker Drive <br />Des. No.: 1400637 <br /> <br />This Contract Amendment is made and entered to this Contract between the City of South Bend Board of <br />Public Works (hereinafter referred to as "LPA") and Lawson-Fisher Associates P.C. (hereinafter referred <br />to as "CONSULTANT"). <br /> <br />WHEREAS, the LPA and CONSULTANT did February 24, 2015 enter a Contract for project <br />development services for the above reference project. <br /> <br />WHEREAS, the LPA and CONSULTANT did enter a Contract Amendment on April 11, 2017 for <br />additional services for the above reference project. <br /> <br />WHEREAS, the LPA desires that CONSULTANT provide further additional services to separate <br />this project into two separately constructed phases, with the first phase ending at Olive Street and Indiana <br />Court intersection, and the second phase to be developed under a separate agreement with INDOT <br />oversight named Olive Street from Indiana Court to Tucker Drive- Phase 2, Des. No. 1920178. <br /> <br />WHEREAS, the LPA desires the CONSULTANT provide additional services addressing the north <br />project limit as has been required for right-of-way engineering, environmental documentation, and <br />previously developed roadway design plans. <br /> <br />WHEREAS, the LPA desires the CONSULTANT provide additional services for revised railroad <br />right-of-way engineering property descriptions from property interests, title updates, and other information <br />received. <br /> <br /> WHEREAS, the LPA desires the CONSULTANT provide additional services for additional utility <br />coordination to facilitate the development of work plans and completion as was necessary for several <br />utilities across these two phases. <br /> <br />WHEREAS, the LPA desires the CONSULTANT provide additional services to develop a Note to <br />File for the currently approved Categorical Exclusion-Level 1 on file with INDOT and other requested <br />information to separate these two projects. <br /> <br />WHEREAS the LPA desires the CONSULTANT provide additional services for design services to <br />separate these two projects to be constructed as separate projects that shall be seamless above and <br />below create when both phases are complete. <br /> <br />WHEREAS, in order to provide for completion of the work, it is necessary to amend and <br />supplement the contract in the amount of $14,525.00 <br /> <br />NOW, THEREFORE, it is agreed by and between the parties that the following Appendices are <br />amended: <br /> <br /> Page 1 of 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.