Laserfiche WebLink
For Tasks 1 to 4 <br />The early tasks would include some “discovery” so that Toole Design can learn and seewhatis happeningin the <br />area. To begin with, it would be helpful for the City to gatherand e-mail to us the relevant land use proposals <br />(i.e., proposed site plans), a base map showing property lines, the properties in play outlined on a map, and the <br />traffic study. We propose to provide have a concept for you withabout 8 to 12 hoursof work. After that, any <br />additional time would be a function of conference calls with the City, refinements and iterations, as <br />requested/needed by the City. Maybe, we estimate that would take about 12 hours too. Once it is developed, I <br />suspect that the best concept will be self-evident. If the Citywants Toole Designreassign traffic numbers, to “test <br />it,” so to speak, then that would be fine. However, I did not include a traffic analysis in this assignment. <br />For Tasks 5 to 6 <br />Once stakeholders get involved, it is hard to estimate their reactions and repercussions because we don’t know <br />them. We assume that the City will arrange/coordinateany outreach. Wepropose that the final product would be <br />a Power Point presentation along with the key files used for the illustrations. I doubt that a report would be <br />needed. We will write a memo to augmentthe Power Point and illustrations, if necessary. I’d suggest that we <br />allocate another 24 hours for thiswork. All submissions will be made digitally. <br />Toole Designwillfocus the on the block structure, relationships, access, circulation… such that the place <br />achieves the objects as best as feasible. We’ll not go into detailon street and intersectiondesigns becausethose <br />can be handled easily internally or later. In other words, the level of detail will be commensurate with the <br />challenge of the assignment and the time/budget. <br />Fees, Expenses, and Schedule <br />We propose a lumps sum fee of $12,500 for the work above. There won’t be any travel expenses. We will invoice <br />monthly until the project is completed.We should haveTasks 1 to 4 completed with 12 business days of receiving <br />the notice to proceed. Tasks5 to 7 involve schedules that we do not control; so we willnot put a time-frame to <br />that but we will endeavorto be available to allow any outreach efforts to be unencumbered by Toole Design. <br />Sincerely, <br />Ian Lockwood PE| Livable Transportation Engineer <br />TOOLE DESIGN <br />8484Georgia Avenue, Suite800| Silver Spring, MD 20910 <br />Email@tooledesign.com| 407-496-2529 <br /> 2 <br /> <br />