My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Eddy Street Commons Traffic Calming Study - Toole Design Group, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Eddy Street Commons Traffic Calming Study - Toole Design Group, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 9:24:59 AM
Creation date
4/16/2020 2:33:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TOOLE 8484 GE RGmA AkVE041UE 301 979.990i9 <br />aVLOFE,R SPRING, MD 20910 <br />April 10, 2020 <br />Tim Corcoran, Director of Planning <br />City of South Bend <br />227 W. Jefferson Boulevard <br />South Bend, IN 46601 <br />Re: Network and Site Planning Services <br />Dear Mr. Corcoran; <br />Thank you for the opportunity to help the City with some network retooling and site design. The scope is outlined <br />in the table below: <br />Study <br />Area I — ••PRIORITY) <br />1. <br />Evaluate the conclusions and recommendations of the existing traffic study for the Howard Street <br />(Eddy to SR23) intersection couplet. <br />2. <br />Propose additional / alternative recommendations to the existing traffic study if necessary. <br />3. <br />Investigate the traffic implications to the wider block (Howard Street, SR23, Campeau Street, <br />Francis Street) around Eddy Street Phase 3 as to how the proposed new development will impact <br />the street network and level of service of the intersections within the study area. <br />4. <br />Propose changes or modifications to the existing street network in order to help manage the traffic <br />load generated by new development while ensuring Complete Street Principles are supported. <br />5. <br />Allow for x7 1 hr video conference meetings to be used as needed. <br />a. One meeting will be a presentation to stakeholders dedicated to the recommendations of <br />this study. <br />b. Other meetings can be used as needed to provide guidance to help develop the <br />recommendations in coordination with the local engineering team and the City of South <br />Bend. <br />6. <br />Documentation of the recommendations in a format that can be shared and easily conveyed to <br />others. This could be in the form of a short report with sketches or other types of illustrations. <br />7. <br />Timing — The local engineering team has a completion timeframe of mid -May. Your <br />recommendations should be coordinated with this timeframe. <br />0,lp,V1SIIu1 41IlIf4VVAT("",r0�")@ IG1) 9E, <r.1`111E D U t L 111Nt0 II"Yf <br />
The URL can be used to link to this page
Your browser does not support the video tag.