.F'. PERIODIC RETESTING AND RE -INSPECTION
<br />1. Cylinder asidTo.n Calltainers to be Tested
<br />q) QpIr I �iders,,,(�,xcepl DOT 3 F 180(�) as tram containea autsl be red ijxted a Heast
<br />owe" infiveycars ('),OTS&Iiow ) 73,34e, an Section 173.31d)',
<br />b) (�vhinders cannot ikfilled qfler thefiveyear anniversary
<br />the calendaryear during which lheh-five r t -sl i
<br />)Aca E 8 0e,
<br />e) RvIesis, are also required after any, 1,-eheal treatfnew, In addition, retesteat y
<br />conAdner which sho mv cvideocepf weakness atalv time, op-shoul a 5 prereent fir,
<br />wore Joss in, weight,
<br />2, TestPreceduce
<br />ej) CPfinders a0d ton containers (,zre 4
<br />ydrosjcjj.;ca,jjy, �,etest ed by dje,kydrustrata
<br />expansio n method [DOT Section 1733 4 (a) and Section 173.31 (tp& Ifa,f file
<br />Unte of reqptal�fication a container sho ww, a Ilea* or a permanant e.vpansion which,
<br />ktveteds 10% of 11te totalexpansionf U nuut heeo,?,Ueonwd-
<br />1, Containner Recorn s,
<br />a) I?ecordN oiuist die kept,sho,vioing reqdrs qj'lhe lev'. Each contabi�rmusthaw the
<br />test dale plabdY andperonaneittly stapywil into the ngetalofone hei4d rM Me
<br />chione of each lask, passing dre hydrostatic retest
<br />CONDMONS OF DELIVERY
<br />1, A South Bend Water, Works represerttative shallspecif)r the location for
<br />dhiorine cylinder and, ton container deliveries.
<br />2. Defivi��ry Locations:
<br />3. Vendor persorintil shal I conduct a] 1. activities relented, to the I oading ntnd
<br />utdoadling, of cyfindm,
<br />4,, I'on ,wntainers will need to, be delivered with a, cherry picker.
<br />,5, Mirrnum deLiver ies are one (1), ton ,,containers and tw elve (12) 1,50#
<br />cylinders
<br />6,Slipplier must be able tin guaranteo delivery wit�hin 3 to 4 catendur days, after
<br />order Placement
<br />T. Vendor personnel 91wil, 110t uIlload any filled cylinders orton, containers prior
<br />to, live inuspection by, South'Berid Water Works Peisonne'l.
<br />
|