My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Water Treatment Chemicals 2020-2024 - Polydyne Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Water Treatment Chemicals 2020-2024 - Polydyne Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:17:29 AM
Creation date
4/16/2020 1:04:34 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I �IMOIINFJW <br />Cyl hiders <br />a) Cj?jOot'O?,C Cylinders are 10, haVe asingle chAm"ine Teflon, Vyk vakeproducad his <br />Sherwood or Tekho xxhlch fs, relid-,71' <br />device. <br />2. Ton Container Valves <br />a) Chloeine On containey,.s' are fohame two kknfical Tdlun styla valves produmiky, <br />tvquirremenj. ", en wirer lica)aligned, the mi've in Iko, upperposition is used for <br />gas wifhdra%�'a), and th,e lower one fir figIdd wilhdrawvL Thestapukrid to <br />container valve iv idemical ro tho eyfindee wdve exeept thn't it Ifus nafimible <br />ryletal type relie'.1"device, and the wive Lveoldhimetermay be larger thailon most <br />cylinder valves. Tkere are towsizes, of to cruitainer valves: 314 inch NGT and I <br />Inch NGT. <br />I Valve Outlet Tfireads <br />as Outlet titre add on cylbukr and ton, conizoiners doreads <br />(1,,030 " - I VVW-a ".y�°T) which u,'mfi,)rmtw connection number CG'.A 820 and, <br />B20C wh Ich utilize a, yoke -type" con mlla"'flon, <br />the trials eqp oj,,j�ly und are not ea be usedfiar chforine hose c6mections, <br />end PRESSURE RELIEF DEVICES <br />I Cylinders, <br />A floy 'A " holder, mdwieh is, saesved into a mpped hie in, the valve IMdY- The <br />fitsible, plug.� are degigned to melt betweet� 158,*grecs, F rand 165 degrees.F.' <br />2. Ton Containers <br />with six threats edfiaible plugs, three in e�"ch head, spiwed qpproxinzatelp 12 0" <br />qXul, <br />3. '11"on, Container and Cylinder Inspection,Cleaning, andl Reconditio.ning, <br />a) In addifion to, the requit- ed period retest, i.P is recoppitended Ilia teach tow <br />Container and eylinder be haerenally and, twernally huperfed prior to each <br />filling. 71iis indudes all appurtenances, gu0i as valvels andfusible pligm <br />Cliferiafijr Such ins than isaudined hi "C'ylinder and Ton container <br />Procedturefi.w Chlarhwe Packaging " Cidary'ne ligsligute Paollphlef 17, Seefinny 3, <br />4" arjfj'5. <br />
The URL can be used to link to this page
Your browser does not support the video tag.