My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Main & Colfax Parking Structure Repairs 2020 Proj No. 115-143B - Ram Construction Services of MI, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Main & Colfax Parking Structure Repairs 2020 Proj No. 115-143B - Ram Construction Services of MI, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 1:19:53 PM
Creation date
4/16/2020 12:27:06 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
O:June |st seems like an aggresmivoschedule-asxuming award / contract might take nweek or <br />two that isalikely start date o[May lst-ish (not assuming any issues with starting due to Cmid). <br />Assuming wehave howait 6o,Cure bnneefor coating etc. -|xJune |o1completion set iostone? <br />[): Would like tnknow o[the new iirneline Could bcextended io8weeks? <br />&: The project will have ouubutuniiol completion date ofJue*a4Jm|y 3 and u Duu\ completion <br />date of]on"- m|y |O. During all work, the Contractor may close Lovc|x 4 and 5, maintaining u <br />drive lane Lip to Levels 6 and 7. The contract time will start when the Notice to Proceed is <br />delivered and signed. <br />(): Is this uprevailing wage projectund was the pre bid uitemdunoc mandatory? <br />&:Nmand No. <br />O: Paint removal is down to bare concrete or 'udvvha1 is |muuu? <br />A: See Section 09 9100 -- 5 in the specifications for expectation of preparing surfaces. <br />P. Preparationofcoated and uncoated concrete uurbicno: <br />1. Concrete surfaces shall be waterblasted as a rninimurn to rernove contaminants <br />and loose paint. Scraping w[the loose paint may bcrequired. <br />2. Surffiuco xhoU be cleaned, dry, and free o{all cou(unoinan(s such as dirt, dust, <br />|ui(uncc, grease, previously applied coatings and other contaminants that Would <br />interfere with the adhesion o[the specified coating syoicnu. <br />3.Properly prepared surfaces shall bedry prior tocoating. <br />4. New concrete sbm|| cure for minimum of20 days prior to oou1ing, or as <br />required hyManufacturer <br />y\ttuohnumdu: <br />• Minority and Women Business EnterpriseNversity Development Program General <br />Conditions <br />• Minority and Women Business Enterprise Diversity Development Program Forms <br />w Typical Level |nnuge <br />w VVu}| Dc|unoinu1ion |ono&e <br />• Unpainted Column Image <br />-This addendum consists ofutotal |Opages inclusive of"Acknowledgement o[Receipt o[ <br />
The URL can be used to link to this page
Your browser does not support the video tag.