Laserfiche WebLink
South BE <br />Regular <br />6. NEW <br />C. <br />Redevelopment Commission <br />tinq - October 24, 1986 <br />INESS ( font . ) <br />Commission authorization requested to amend <br />contract with Lawson Fisher & Associates for <br />design services and construction management in <br />the South Bend Central Development Area. <br />. Matthews explained that the contract is <br />ended to 9% of the final cost estimate <br />then than 9% of final cost, which eliminates <br />e open -ended nature of the contract. Ms. <br />tthews showed and explained the drawings of <br />e walkway. The project will be undertaken <br />the spring. The funding source for it is <br />F funds. <br />a motion by Ms. Auburn, seconded by Mr. <br />and unanimously carried, the Commission <br />rized the amendment to the contract with <br />n Fisher and Associates for design <br />ces and construction management for the <br />Bend Central Development Area. <br />r. Hunt added that the Commission needs to <br />ormally ask the Board of Works to handle <br />onstruction of the walkway. <br />pon a motion by Mr. Piasecki, seconded by Mr. <br />onoho and unanimously carried, the Commission <br />uthorized a letter to the Board of Works <br />sking the Board of Works to accept this <br />roject and undertake it for the Commission, <br />dvertising and accepting bids and awarding <br />ids for the construction of the walkway. <br />d. ommission authorization requested to sell <br />Parcel M2 -8. <br />r. Panzica, representing River Glen South <br />ssociates, proposes to develop Parcel M2 -8 as <br />professional office building, tying it in to <br />he existing Panzica Construction Building. <br />he proposed building would be three stories, <br />ith the first story being half below ground <br />evel. The scale and design of the building <br />ould emulate the Panzica building. There <br />ill be 12,672 s.f. of office space plus <br />-5- <br />COMMISSION AUTHORIZED AMENDED <br />CONTRACT WITH LAWSON FISHER & <br />ASSOCIATES FOR DESIGN SERVICES <br />AND CONSTRUCTION MANAGEMENT IN <br />THE SOUTH BEND CENTRAL DEVELOP- <br />MENT AREA <br />COMMISSION AUTHORIZED A LETTER <br />TO THE BOARD OF WORKS ASKING <br />THE BOARD OF WORKS TO UNDERTAKE <br />THIS PROJECT FOR THE COMMISSION <br />