My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-30-12 Redevelopment Commission Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2010-2019
>
2012
>
08-30-12 Redevelopment Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2012 12:06:14 PM
Creation date
9/28/2012 12:06:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br /> Regular Meeting—August 30, 2012 <br /> 6. NEW BUSINESS (CONT.) <br /> E. Northeast Neighborhood Development Area <br /> (1) continued... <br /> work that's happening on Eddy Street by <br /> Eddy Street Commons. The master plan is a <br /> vision of what might happen, but in order to <br /> make that reality, staff needs to look at what <br /> utilities might need to be relocated. <br /> Mr. Varner asked whether the utility <br /> relocation would be based on the new street <br /> alignment. Mr. Kain replied that there will <br /> be some relocation done as part of the SR23 <br /> project, but that will only focus on the <br /> utilities in or near the street, not those within <br /> the parcels. <br /> Mr. Inks asked Mr. Kain to make comments <br /> on the electrical utilities that staff is already <br /> looking at to reroute through the area. Mr. <br /> Kain responded that the initial proposal from <br /> AEP was to take their high tension electric <br /> poles through the intersection along the south <br /> side of the streets. Given the vision for <br /> commercial development here, there is a <br /> desire by local developers and NNRO to <br /> relocate the electric poles. Engineering staff <br /> has been coordinating this project, which <br /> includes moving the poles south from Duey <br /> Street down existing alleys to Corby and then <br /> west. <br /> Mr. Varner asked if the electric is being done <br /> as part of the road realignment. Mr. Kain <br /> answered that the electric will be done as part <br /> of the realignment. AEP will cover most of <br /> the cost, but there is a small gap that Public <br /> Works will be covering. There is no cost to <br /> the Redevelopment Commission. There is a <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.