My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 14 - Howard Park Redevelopment and St. Louis Blvd. Improvements Proj No. 117-047B - Larson-Danielson Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders
>
Change Order No 14 - Howard Park Redevelopment and St. Louis Blvd. Improvements Proj No. 117-047B - Larson-Danielson Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 10:54:50 AM
Creation date
3/11/2020 10:55:05 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11 i'll" Y NA N;p <br />41 <br />SOUTH BEND PARKS PROGRAM <br />�' CHANGE ORDER NO. 14 COVER SHEET <br />DATE INITIATED: 2-1-2020 REQUIRED APPROVAL DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />1. Extend completion time to May 8'n <br />2. Cafe Temp Lights -owner directed <br />3. UPS for Ice Rink Control Board -omission <br />4. Skate Sharpener Outlet- owner directed <br />5. By Pass per ASI #39- omission <br />6. Relocate Thermostat on T@M —owner directed <br />7. Change Mech Room Light — owner directed <br />8. Change Lightning protection due to RTU-omission <br />9. Firestop between Garage and Mechanical Room —omission <br />10. Playground surface impact test — omission <br />11. Added LH door to office A110- Owner requested <br />12. 40 spare skate holder- owner requested <br />13. Add Interior and exterior Displays -owner requested <br />14. Reroute MC Cable for Added Door A110- Owner request <br />15. Install Plywood on framing above Restroom Ceiling- Owner request <br />16. Furnish 2 Tosi-Box Keys for Ice Trail —owner request <br />Increase/(Decrease) from previously approved Change Order(s): <br />$ 29 728.18 <br />..... .... <br />Date/Time Added: <br />Mav 8 2020 final completion adding 145 days <br />..—............ __ ................................................. <br />New Contract Sum with This Change Order: <br />$ 18,903,827.46 <br />Percent of Change Order: _.............. <br />SUBMITTED/PREPARED BY: <br />Categories (Pick One): <br />ElScope of Work <br />LIT—] Differing Site Conditions, Changed Conditions <br />EConflicted Specifications and Drawings <br />El <br />Failed Materials <br />iJ <br />Errors and Omissions <br />rr <br />Incentive/Disincentive <br />Final Quantity Adjustment <br />x <br />Owner Directed <br />ENDORSEMENTS/APPROVALS <br />Resident Project Representative (Print Name) (Sig strata) <br />RECOMMENDED:. <br />114 I <br />Construction Man er (Print Name) <br />8ECOMMENDED: -% <br />Project Manger (Print Name) <br />REVII D: <br />Project Manager, Venue, Parks and Arts (Print Name) <br />RECOMMENDED FOR APPROVAL: <br />( rgnature) <br />®! <br />(Date) <br />Z.. 49 2u <br />(Date) <br />(Date) <br />`. ( 0 "Z <br />(Date) <br />Director, Venue, Parks and Arts (Print Name) <br />(Signature) <br />(Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.