My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02252020 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2020
>
02252020 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:16:50 PM
Creation date
3/10/2020 11:31:51 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
2/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />FEBRUARY 25, 2020 37 <br />Division C Total <br />No Bid <br />Division D Total <br />No Bid <br />Division E Total <br />No Bid <br />Division E Alternate Items <br />No Bid <br />SLATILE ROOFING AND SHEET METAL CO.. INC. <br />1703 South Ironwood Dr. <br />South Bend, IN 46613 <br />Bid was signed by: Gerald E. Longerot <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted <br />Five (5%) Bid Bond was submitted <br />Division A Total <br />$184,693.00 <br />Division B Total <br />$305,000.00 <br />Division C Total <br />No Bid <br />Division D Total <br />No Bid <br />Division E Total <br />No Bid <br />Division E Alternate Items <br />No Bid <br />Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried, the above bids were <br />referred to Community Investment and Engineering for review and recommendation. <br />OPENING AND AWARD OF QUOTATIONS AND APPROVAL OF CONTRACT — <br />HYDRANT RELOCATION — PROJECT NO. 120-021 (WATER CAPITAL) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following Quotations were opened and read: <br />SELGE CONSTRUCTION CO.. INC. <br />2833 S. IIfl. St. <br />Niles, MI 49120 <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Quotation was submitted by Justin Butler <br />QUOTATION: $45,870 <br />HRP CONSTRUCTION INC. <br />5777 Cleveland Rd., PO Box 266 <br />South Bend, IN 46624 <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Quotation was submitted by Nancy Knapik <br />QUOTATION: $96,462 <br />Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried, the above quotations <br />were referred to Engineering for review and recommendation. After reviewing those quotations, <br />Ms. Alicia Czarnecki, Engineering, recommended that the Board award the contract to the lowest <br />responsive and responsible bidder, Selge Construction Co., Inc., 2833 S. I Vh. St., Niles, MI <br />49120, in the amount of $45,870. Therefore, Ms. Maradik made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Mr. Molnar <br />seconded the motion, which carried. <br />OPENING OF QUOTATIONS — LEGAL DEPARTMENT SOLAR SHADES (LEGAL <br />DEPARTMENT OFFICE SUPPLIES) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotation was opened and read: <br />
The URL can be used to link to this page
Your browser does not support the video tag.