My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/1904 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1904
>
06/1904 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:25:34 PM
Creation date
3/5/2020 2:20:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
6/1/1904
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Board met in regular session at 10 A. Y. Mr• :.'Papezyngki absent. <br />The following communication was received from the South Bend Electric Company <br />Board of Public Works, <br />South Bend, Ind. <br />Gentlemen: -- <br />In compliance with your request, we took up with Yr. Carlton, whom we have <br />employed as. consulting engineer on our undergroung Work, the question of electrolysis <br />resulting from our proposed work. We enclose you herewith the reply received from fir. <br />Carlton this morning. Yours very truly, <br />SOUTH BEND ELECTRIC CO1SPANY. <br />By F.A. Bryan Sec' y & Gen' 1 I-gr. <br />South Bend Electric Companyq <br />Douth Bend, Ind. <br />Dear Sirs: - <br />I underartand that in connection with your proposed underground work, the <br />City authorities have brought up the possibility of electrolytic action on water pipe3 <br />due to your cables. With the system yoa propose to install there can be no danger <br />from electrolysis. Practically all damage to water and gas pipes from electric <br />current is due to, current from street railroads and they use direct current and operat <br />with a ground return. It is necessary to have these two conditions, direct current <br />and grounded re turn. that there may be danger t o water and gas pi pe s and even wi t h the- <br />se conditions if the work is properly done, there should be no danger. <br />You will use alternating current and will not depend on a ground return, and as <br />I have already stated there can be no danger from electrolysis. <br />I have had charge of the underground system of the Chicago Edison Company for the <br />past three years and have been. in touch with the work for ten years and have yet to <br />hear of a grater pipe damaged by our lines. We nave installed more than 1,000 <br />miles of cable for both -direct and alternating current work. <br />Yours truly, <br />W. E. Carlton, <br />Asst. to Chief Operating Engineer.. <br />Bids were 'opened for <br />the Construction <br />of Brick <br />pavement on Vistula aveme and <br />Ohio street Brick. Same <br />were referred to <br />Engineer <br />for tabulation. <br />Plan of the Central Union Telephone Co's underground conduit system filed and <br />approved. <br />Coj�-munication sent to the Indiana. Railway company requesting that the wood trolly <br />poles in the downtown district to be replaced with Iron Poles. <br />
The URL can be used to link to this page
Your browser does not support the video tag.